City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
07-082 - Robert Droll Landscape Architecture - Tukwila Pond Park Development
COT-City
>
City Clerk
>
Contracts and Agreements
>
2000-2010
>
2007
>
07-082 - robert Droll Landscape Arch
>
07-082 - Robert Droll Landscape Architecture - Tukwila Pond Park Development
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2011 9:40:06 AM
Creation date
1/5/2010 2:58:23 PM
Metadata
Fields
Template:
Contracts and Agreements
Contract No (example 17-139)
07-082
Contractor (example *sabey*)
robert Droll Landscape Arch
Description (example *tourism*)
Tukwila Pond Park Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
3 -16-07 <br />Tukwila Pond Interpretive Trail <br />City of Tukwila, WA <br />Project Scope of Work Fee <br />Tasks Total <br />Phase 2 <br />I 4.001 Design Development 160 Submittal <br />I 4.01 (Title Sheet <br />4.021 Demolition TESC Plan <br />4.031Layout/Grading Plans <br />4.041 Boardwalk Plan and Details <br />4.051 Site Details <br />4.061 Estimate of Probable Costs <br />4.071 Review with Staff <br />'Task Total <br />5.001 Final Design 90% Submittal <br />5.011Titie Sheet <br />5.021 Demolition TESC Plan <br />5.031Layout/Grading Plan <br />5.041 Boardwalk Plan and Details <br />5.051 Site Details <br />5.061 Estimate of Probable Costs <br />5.071Specifications Division 1 -16 <br />5.081 Review with Staff <br />5.091 Building Permit Application /Processing <br />5.101 Quality Review <br />I Task Total <br />1 <br />6.001 Bid Documents -100 Submittal <br />6.011Title Sheet <br />6.021 Demolition TESC Plan <br />6.031Layout/Grading Plan <br />6.041 Boardwalk Plan and Details <br />6.051 Site Details <br />6.061 Estimate of Probable Costs <br />6.071 Specifications Division 1 -16 <br />6.08IAssemble Deliver Contract Documents 1 <br />I Task Total I <br />7.001 Meetings Project Coordination 1 <br />7.011 Project Management via phone, fax, email, etc I <br />I Task Total 1 <br />8.001Bidding, Negotiations 1 <br />I Task Total 1 <br />I I <br />9.001 Construction Services <br />9.011 Pre- Construction Conference I <br />9.021ConstructionObservation 1 <br />9.031Punchlistand Final Walk -Thru I <br />'Task Total I <br />Tasks Subtotal <br />Direct Expenses (plots, phone, reproduction, mail, travel) <br />Subconsultant Administration <br />Professional Services Fee Total <br />Attachment B <br />Phase 2 <br />Not in this Scope <br />of Work <br />Robert W Droll, Landscape Architect, PS 360.456.3813 <br />
The URL can be used to link to this page
Your browser does not support the video tag.