City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
07-082 - Robert Droll Landscape Architecture - Tukwila Pond Park Development
COT-City
>
City Clerk
>
Contracts and Agreements
>
2000-2010
>
2007
>
07-082 - robert Droll Landscape Arch
>
07-082 - Robert Droll Landscape Architecture - Tukwila Pond Park Development
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2011 9:40:06 AM
Creation date
1/5/2010 2:58:23 PM
Metadata
Fields
Template:
Contracts and Agreements
Contract No (example 17-139)
07-082
Contractor (example *sabey*)
robert Droll Landscape Arch
Description (example *tourism*)
Tukwila Pond Park Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Attachment A <br /> Tukwila Pond Trail Tukwila Parks Recreation 4/24/2007 <br /> Scope of Services <br /> Tukwila Pond Trail Boardwalk <br /> City of Tukwila Parks and Recreation Department <br /> Scope of Work <br /> This assignment includes the Schematic and Final Design services work to be performed by Robert W. <br /> Droll, Landscape Architect, PS and Project Team (hereinafter collectively, RWD) for the City of <br /> Tukwila, Washington on Tukwila Pond Trail Boardwalk. RWD will serve as consultant to Tukwila in <br /> the capacity of Park Planner/Landscape Architect and will prepare Bid Documents. The goal of the <br /> project is to implement a new Loop Trail and Boardwalk around Tukwila Pond. <br /> Basis of Proposal <br /> This Scope of Services and Fee Proposal are based upon discussions and information provided by the <br /> Tukwila Parks and Recreation Department, site visits and documentation review. <br /> Scope of Services <br /> RWD proposes the following Scope of Services to accomplish the work necessary for the preparation of <br /> Tukwila Pond Trail Boardwalk (hereinafter the "Trail'). <br /> Phase 1 <br /> Task 1 Schematic Design -35% Submittal <br /> Task 1.01 Site Visit <br /> RWD will visit site with Client, wetland biologists and survey crew. <br /> Task 1.02 Wetland Delineation <br /> Conduct wetland delineation, category rating and report in compliance with City of Tukwila Critical <br /> Areas Ordinance. <br /> Task 1.03 Boundary and Design Survey <br /> Conduct topographical fieldwork necessary to generate mapping of one foot contours, spot elevations, <br /> trees, six inches and larger, and other planimetric features. Survey will include bathymetric survey of <br /> pond from shoreline to fifty feet into pond. Show Boundary Survey as provided by Tukwila. Prepare <br /> mapping in ACAD format. <br /> Task 1.04 Concept Plan Cost Estimate <br /> RWD will prepare Concept Plan illustrating type, size and location of main loop trail and boardwalk <br /> and spur connections. RWD will provide Estimate of Probable Cost based upon measured quantities. <br /> Task 1.05 PreSubmission Conference w/ Tukwila <br /> RWD will prepare PreSubmission Conference application and attend PreSub Conference. <br /> Robert W Droll, Landscape Architect, PS, 4405 7 Avenue, Lacey, WA, SE, 98503, 360 456.3813, bob @rwdroll.com I <br />
The URL can be used to link to this page
Your browser does not support the video tag.