Laserfiche WebLink
2 Connection to District's Line. The aforemen- <br />tioned new service will be connected to the District's 6 -inch <br />main which crosses the railroad tracks outside and northwest <br />of the entrance to the Seattle Rendering Works, Inc. plant. <br />3. Flow Meter. The City will install a 6 -inch <br />flow meter and vault in the new service at the west property <br />line of the Seattle Rendering Works, Inc. <br />4 Easements. The City will obtain and later as- <br />sign to the District all necessary easements from the landowners <br />M L Investments and Burlington Northern Railroad. The <br />legal description of the Seattle Rendering Works, Inc. property <br />is as follows: <br />That portion of C. E. Brownell Donation Claim <br />more particularly described as follows: <br />Beginning near the West line of Section 13, <br />Township 23 N, Range 4 E.W.M. at a concrete <br />monument which is 1,510.74 feet South of and <br />2,143.89 feet West of the Northeast corner of <br />said donation Claim and running thence Due <br />West parallel to the North line of said Dona- <br />tion Claim 1,715.29 feet to a point one foot <br />West of the Most Westerly rail of the North- <br />ern Pacific Railroad; thence parallel to said <br />rail North 27 °21'30" West 668.61 feet; thence <br />south 69 °22'40" west 47.44 feet to an iron <br />pipe on the Westerly line of the right of way <br />of said Northern Pacific Railroad, which iron <br />pipe is the true point of beginning; thence <br />continuing South 69 °22'40" West 190.00 feet <br />to a second iron pipe at the top of the East <br />Bank of the Duwamish river; thence continuing <br />south 69 °22'40" west about 30 feet to mean <br />-2- <br />