City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
92-012 - Rabanco / City of Renton - Black River CDL Recycling and Transfer Station
COT-City
>
City Clerk
>
Interlocal Agreements
>
1992-1997 Interlocal Agreements
>
92-012 - Rabanco / City of Renton - Black River CDL Recycling and Transfer Station
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2010 2:52:52 PM
Creation date
10/4/2010 8:58:19 AM
Metadata
Fields
Template:
Interlocal Agreements
Contract No (example 17-139)
92-012
Contractor (example *sabey*)
Rabanco & City of Renton
Description (example *tourism*)
Black River CDL Recycling & Transfer Station
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6. WHEREAS the City of Renton, in a close working relationship with the City of Tukwila, has <br />prepared a Final Environmental Impact Statement "FEIS which was issued in August 1991 and an <br />Environmental Mitigation Document which was issued by the City's Environmental Review Committee "the <br />ERC in November 1991 (together "ERC Document which ERC Document included the comments <br />received from the City of Tukwila as well as comments received from the public and also contained <br />mitigation conditions applicable to the Project; and <br />7 WHEREAS the City of Tukwila appealed the ERC Document, on December 2, 1991 to the <br />City of Renton Hearing Examiner Hearing Examiner") and <br />8 WHEREAS Renton has consulted with the representatives of the Parties involved in the <br />appeals noted above regarding how best to clarify the mitigation measures identified within the ERC <br />documents and <br />9 WHEREAS the City of Renton City of Tukwila, and Rabanco have agreed 1) to review <br />noise complaints and to determine the parameters of the noise analysis required by the City of Renton 2) <br />work with the U S Army Corps of Engineers to identify additional potential wetland areas 3) clarify and <br />refine the wetland monitoring program 4) review the hours of operation and monitor the noise mitigation <br />program and <br />10 WHEREAS the Parties involved each believes that it would prevail in its position and <br />assertions regarding the above described appeals and the City of Renton believes it would prevail in <br />defense of the FEIS and ERC Document, and each of the Parties believes it would prevail in any <br />subsequent litigation regarding this matter but at the same time has given due consideration to the <br />clarification of the issues and the new information outlined above the unavoidable delays and hazards of <br />these appeals and the expenses connected thereto and has recognized desirability of terminating this <br />appeal on the subject property without further expense and litigation, and <br />11 WHEREAS the Parties wish to ensure that the proposed project complies with the Code <br />requirements and standards established at the time that the Project was approved by the City of Renton <br />and <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.