Laserfiche WebLink
6. WHEREAS the City of Renton, in a close working relationship with the City of Tukwila, has <br />prepared a Final Environmental Impact Statement "FEIS which was issued in August 1991 and an <br />Environmental Mitigation Document which was issued by the City's Environmental Review Committee "the <br />ERC in November 1991 (together "ERC Document which ERC Document included the comments <br />received from the City of Tukwila as well as comments received from the public and also contained <br />mitigation conditions applicable to the Project; and <br />7 WHEREAS the City of Tukwila appealed the ERC Document, on December 2, 1991 to the <br />City of Renton Hearing Examiner Hearing Examiner") and <br />8 WHEREAS Renton has consulted with the representatives of the Parties involved in the <br />appeals noted above regarding how best to clarify the mitigation measures identified within the ERC <br />documents and <br />9 WHEREAS the City of Renton City of Tukwila, and Rabanco have agreed 1) to review <br />noise complaints and to determine the parameters of the noise analysis required by the City of Renton 2) <br />work with the U S Army Corps of Engineers to identify additional potential wetland areas 3) clarify and <br />refine the wetland monitoring program 4) review the hours of operation and monitor the noise mitigation <br />program and <br />10 WHEREAS the Parties involved each believes that it would prevail in its position and <br />assertions regarding the above described appeals and the City of Renton believes it would prevail in <br />defense of the FEIS and ERC Document, and each of the Parties believes it would prevail in any <br />subsequent litigation regarding this matter but at the same time has given due consideration to the <br />clarification of the issues and the new information outlined above the unavoidable delays and hazards of <br />these appeals and the expenses connected thereto and has recognized desirability of terminating this <br />appeal on the subject property without further expense and litigation, and <br />11 WHEREAS the Parties wish to ensure that the proposed project complies with the Code <br />requirements and standards established at the time that the Project was approved by the City of Renton <br />and <br />2 <br />