Laserfiche WebLink
b Semi annual sampling /monitoring of the biofiltration swale and wetlands <br />areas for changes to pre development conditions for the first five years of operations. The <br />monitoring shall be conducted by a consultant approved by the City of Renton with all costs being <br />born by Rabanco as identified in the Mitigation Document. <br />c Any adverse impacts which are identified as a result of the monitoring <br />shall be immediately mitigated by Rabanco once a mitigation plan is agreed upon by Renton. <br />Additional monitoring shall also be instituted to establish the effectiveness of mitigating actions and <br />the absence of secondary adverse impacts. <br />4 Noise Mitiaation Proaram Rabanco Tukwila, and Renton shall establish a <br />committee to resolve noise issues regarding the proposed project (hereafter referred to as the <br />Committee The Committee shall be composed of three members, one member from Rabanco <br />one member from Tukwila City staff, and one member from Renton City staff the members shall be <br />selected by their respective City with Rabanco selecting its own member <br />The Committee shall meet within five months of the start of operation with the noise <br />consultant, selected by the City of Renton The purpose of the Committee shall be. 1) to discuss <br />any noise complaints that have been received 2) discuss the parameters of the proposed noise <br />study with the consultant, including frequency of the testing and location of the noise monitoring <br />stations, (see note below) and 3) to review the abatement measures, if any, proposed by the <br />noise consultant. The budget for the noise study shall be the $25 000 00 established as part of <br />Mitigation Measure #19 in the Mitigation Document. <br />The Committee shall be reconvened within six months of the issuance of the occupancy <br />permit for any cumulative material expansion which shall be considered any expansion to the <br />Project equal to twenty -five percent (25 or more of the gross floor area of the process building <br />described in the EIS Document. The purpose of the Committee at this time will be to review any <br />noise nuisance complaints received since the expansion of the Project and to advise Renton as to <br />any future actions the Committee may feel are necessary Funding for such improvements may be <br />paid from any unspent funds in the surety device identified and called for in Item 19 of the <br />Mitigation Document. <br />In the event that there is a dispute over the recommendations which cannot be resolved <br />by the Committee the City of Tukwila s Community Development Director and the City of Renton s <br />Administrator of Planning /Building /Public Works "the Directors will apply their best efforts to <br />resolve disputes and other matters between the Committee members arising out of or related to <br />