Laserfiche WebLink
I. TERM OF AGREEMENT <br />III. PURPOSE <br /> C FILE <br />INTERAGENCY COOPERATION AMEEMENT <br />THIS AGREEMENT, made and entered into on o 1992 <br />between the City of Tukwila, (hereinafter called/ "Tukwila <br />and the City of Seattle, by and through its Water Department <br />(hereinafter called "Seattle <br />W I T N E S S E T H <br />NOW THEREFORE, it is hereby agreed as follows: <br />II. ADMINISTRATION OF AGREEMENT <br />WHEREAS, Tukwila proposes to proceed with a road <br />construction project outside the Seattle City limits, <br />commonly known as the South 160th Street, 42nd to 51st Ave. <br />S., Street Improvements, (hereinafter referred to as the <br />"Project and <br />WHEREAS, Seattle plans to provide encasement around an <br />existing 60" waterline near 43rd Ave. S. on the project site <br />in accordance with all applicable laws, regulations, and <br />franchises; and <br />WHEREAS, Tukwila and Seattle both can achieve benefits <br />in the public's interest by utilizing Tukwila's construction <br />contractor(s) to perform certain work for Seattle during <br />construction of the Project, namely that the contractor <br />install 120 lineal feet of 60 -inch diameter pipe encasement <br />along the road rights -of -way from Sta. 52 +90 to Sta. 54 +10 <br />(hereinafter referred to as the "Seattle Work and <br />This Agreement shall remain in full force and effect <br />until 30 days after final acceptance of the construction work <br />to be performed hereunder. <br />Seattle's Superintendent of the Water Department and <br />Tukwila's Director of Public Works are responsible for <br />administering this Agreement. <br />It is the purpose of this Agreement to realize cost <br />savings and other mutual public benefits by having the same <br />general construction contractor simultaneously perform <br />related work for both Tukwila and Seattle under one Tukwila <br />construction contract, and having Tukwila coordinate said <br />work. <br />