City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
94-051 - GRFCZD (Green River Flood Control Zone District) - Maintenance for Tukwila 205 Levee Project
COT-City
>
City Clerk
>
Interlocal Agreements
>
1992-1997 Interlocal Agreements
>
94-051 - GRFCZD (Green River Flood Control Zone District) - Maintenance for Tukwila 205 Levee Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2010 3:20:38 PM
Creation date
10/4/2010 8:58:30 AM
Metadata
Fields
Template:
Interlocal Agreements
Contract No (example 17-139)
94-051
Contractor (example *sabey*)
GRFCZD Green River Flood Control Zone
Description (example *tourism*)
Maintenance for Tukwila 205 Levee
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
NOW, THEREFORE, the parties hereto agree as follows: <br />PURPOSE OF AGREEMENT: <br />The PURPOSE of this agreement is to establish maintenance <br />responsibilities for the TUKWILA 205 PROJECT between TUKWILA and <br />the DISTRICT. <br />RESPONSIBILITIES OF THE PARTIES: <br />A. GREEN RIVER FLOOD CONTROL ZONE DISTRICT <br />The DISTRICT will assume the following responsibilities for the <br />TUKWILA 205 PROJECT: <br />1. Annual maintenance assessments and maintenance for <br />the TUKWILA 205 PROJECT will be provided by the DISTRICT: <br />beginning in 1994; <br />2. Required maintenance of the TUKWILA 205 PROJECT will 6 <br />provided by the DISTRICT in accordance with U.S. Army Corps <br />of Engineers' specifications;} required permits and approvals, <br />and will be consistent with TUE(WILA's local sponsor <br />responsibilities as outlined in the January 31, 1991 Local <br />Cooperation Agreement (LCA) with the Corps of Engineers and <br />in the Corps' Operations and Maintenance Manual for the <br />project (hereinafter referred to as the "CORPS' O &M <br />MANUAL <br />3. Funding for TUKWILA 205 PROJECT maintenance activities shall <br />be provided for in the DISTRICT's annual budget process, <br />pursuant to the provisions and limitations of Resolution GR -1 <br />and annual Resolutions by the DISTRICT's Board of Supervisors <br />which authorize the DISTRICT budget and work program; <br />4. The DISTRICT will notify TUKWILA of the schedule and <br />results of annual maintenance assessments and of the <br />schedule for required maintenance work; <br />5. The DISTRICT shall be responsible for all supervision, <br />inspections, assessments, record keeping, reporting, <br />maintenance, and operations as set forth in Attachment A <br />hereto and as necessary for the administration of this <br />interlocal agreement. <br />B. CITY OF TUKWILa <br />TUKWILA will assume the following responsibilities for the <br />TUKWILA 205 PROJECT: <br />1. TUKWILA will be responsible for providing the DISTRICT with <br />the following information and guidance by December 31, 1993: <br />
The URL can be used to link to this page
Your browser does not support the video tag.