Laserfiche WebLink
SECTION 10. GUYS <br />SECTION 11. MAINTENANCE <br />SECTION 13. UNDERGROUND <br />Master Pole Attachment Agreement <br />9.3 Company shall promptly and satisfactorily correct or replace any work or <br />Equipment found to be defective or not in conformity with the requirements of this <br />Agreement (including, but not limited to, the requirements of Section 8 and <br />Paragraph 9.2). If Company fails or refuses to perform any Work required by this <br />Agreement or to make any such corrections or replacements, City Light may <br />perform such Work and make such corrections and replacements at Company's <br />expense. <br />9.4 Company shall, at all times, keep its work areas cleared of rubbish, refuse and <br />other debris and in a neat, clean and safe condition. Upon completion of any <br />portion of any of the Work, Company shall promptly remove all rubbish, refuse <br />and other debris and all of its equipment and surplus materials. If Company fails <br />to do so, City Light may perform such work at Company's expense. <br />Unless otherwise directed by City Light, Company shall install guys and anchors <br />necessary to support the additional strain imposed on any pole by attachment of the <br />Equipment. If City Light installs or replaces guys or anchors to support the strain <br />imposed by attachment of the Equipment, Company shall reimburse City Light on demand <br />for the entire cost of such installation or replacement (including, but not limited to, the <br />cost of installing or transfemng guys to such anchors). <br />Company shall maintain all Equipment attached to any pole in good and safe condition and <br />state of repair. <br />SECTION 12. RELOCATION. REPLACEMENT. AND REMOVAL OF POLES <br />Changes in location or attachment of Company's Equipment as required by City Light due <br />to the pole being relocated, replaced, or removed shall be made by Company at <br />Company's own expense within thirty (30) days after receiving written notice. <br />If City Light plans to install its electrical distribution system underground in an area and if <br />Company serves or has potential for serving such area, Company shall cooperate with <br />City Light in the planning, engineering, and underground installation of the Equipment. <br />SECTION 14. RELEASE. INDEMNITY AND HOLD HARMLESS <br />14.1 Company releases and shall defend, indemnify and hold harmless City Light, its <br />successors and assigns, and the respective directors, officers, employees and agents <br />of City Light and its successors and assigns (collectively referred to as the <br />4 <br />