City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
96-086 - Seattle City Light - Master Pole Attachment
COT-City
>
City Clerk
>
Interlocal Agreements
>
1992-1997 Interlocal Agreements
>
96-086 - Seattle City Light - Master Pole Attachment
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2010 3:42:49 PM
Creation date
10/4/2010 8:58:41 AM
Metadata
Fields
Template:
Interlocal Agreements
Contract No (example 17-139)
96-086
Contractor (example *sabey*)
Seattle City Light
Description (example *tourism*)
Master Pole Attachment
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SECTION 10. GUYS <br />SECTION 11. MAINTENANCE <br />SECTION 13. UNDERGROUND <br />Master Pole Attachment Agreement <br />9.3 Company shall promptly and satisfactorily correct or replace any work or <br />Equipment found to be defective or not in conformity with the requirements of this <br />Agreement (including, but not limited to, the requirements of Section 8 and <br />Paragraph 9.2). If Company fails or refuses to perform any Work required by this <br />Agreement or to make any such corrections or replacements, City Light may <br />perform such Work and make such corrections and replacements at Company's <br />expense. <br />9.4 Company shall, at all times, keep its work areas cleared of rubbish, refuse and <br />other debris and in a neat, clean and safe condition. Upon completion of any <br />portion of any of the Work, Company shall promptly remove all rubbish, refuse <br />and other debris and all of its equipment and surplus materials. If Company fails <br />to do so, City Light may perform such work at Company's expense. <br />Unless otherwise directed by City Light, Company shall install guys and anchors <br />necessary to support the additional strain imposed on any pole by attachment of the <br />Equipment. If City Light installs or replaces guys or anchors to support the strain <br />imposed by attachment of the Equipment, Company shall reimburse City Light on demand <br />for the entire cost of such installation or replacement (including, but not limited to, the <br />cost of installing or transfemng guys to such anchors). <br />Company shall maintain all Equipment attached to any pole in good and safe condition and <br />state of repair. <br />SECTION 12. RELOCATION. REPLACEMENT. AND REMOVAL OF POLES <br />Changes in location or attachment of Company's Equipment as required by City Light due <br />to the pole being relocated, replaced, or removed shall be made by Company at <br />Company's own expense within thirty (30) days after receiving written notice. <br />If City Light plans to install its electrical distribution system underground in an area and if <br />Company serves or has potential for serving such area, Company shall cooperate with <br />City Light in the planning, engineering, and underground installation of the Equipment. <br />SECTION 14. RELEASE. INDEMNITY AND HOLD HARMLESS <br />14.1 Company releases and shall defend, indemnify and hold harmless City Light, its <br />successors and assigns, and the respective directors, officers, employees and agents <br />of City Light and its successors and assigns (collectively referred to as the <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.