City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
02-037 - City of Renton - South 180th Street Grade Separation
COT-City
>
City Clerk
>
Interlocal Agreements
>
1998-2003 Interlocal Agreements
>
02-037 - City of Renton - South 180th Street Grade Separation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2010 10:27:17 AM
Creation date
10/4/2010 8:59:02 AM
Metadata
Fields
Template:
Interlocal Agreements
Contract No (example 17-139)
02-037
Contractor (example *sabey*)
City of Renton
Description (example *tourism*)
South 180th Street Grade Separation
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
changes it wishes to make in the plans and specifications, which affect Renton's portion, <br /> which changes shall be made, if feasible. The Tukwila City Engineer will have the authority <br /> to determine whether any changes requested by Renton will be implemented. Renton will <br /> only be financially responsible for those requested construction changes if they are <br /> betterment changes that change the scope of work or the approved construction plans and <br /> result in an increase in the project's cost. Renton will not be responsible for the costs of <br /> change orders that are due to unknown field conditions or design problems that are identified <br /> during the project construction. Renton's financial responsibility will be in addition to <br /> Renton's lump -sum payment to Tukwila described below. <br /> 4.3 Tukwila will at all times keep Renton advised as to the progress of the Project, and shall not <br /> order or approve any changes in the approved Project design that substantially change the <br /> nature of the Project within the limits of the City of Renton without first consulting Renton. <br /> Tukwila's City Engineer will have the authority to determine whether any changes will be <br /> implemented. <br /> 4.4 Tukwila shall notify Renton of the "project substantial completion date." Prior to the "project <br /> physical completion date Tukwila and Renton shall perform a final inspection of the project <br /> located within Renton. Renton may provide a written deficiency list to Tukwila within ten <br /> working days after the inspection. The contractor will complete only construction <br /> deficiencies that comply with the contract specifications. Final Project acceptance will be by <br /> Tukwila's City Engineer. <br /> 5. OWNERSHIP AND MAINTENANCE <br /> 5.1 Relocated water and sewer utilities will remain City of Renton facilities and Renton will <br /> assume ownership and maintenance after final contract acceptance by the City of Tukwila. <br /> Renton will be entitled to the one -year construction warranty required by the project <br /> construction contract to be provided by the contractor. Tukwila will be responsible for <br /> enforcing the warranty if Renton identifies construction deficiencies, which are covered by <br /> the one -year construction warranty required in the construction contract. Should the parties <br /> be unable to agree upon warranty items, then Section 9, Dispute Resolution, shall govern. <br /> Interlocal Agreement Page 5 of 10 <br /> Cin of Tukwila City of Renton <br /> S. 180`" St Grade Separation <br />
The URL can be used to link to this page
Your browser does not support the video tag.