City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
02-037 - City of Renton - South 180th Street Grade Separation
COT-City
>
City Clerk
>
Interlocal Agreements
>
1998-2003 Interlocal Agreements
>
02-037 - City of Renton - South 180th Street Grade Separation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2010 10:27:17 AM
Creation date
10/4/2010 8:59:02 AM
Metadata
Fields
Template:
Interlocal Agreements
Contract No (example 17-139)
02-037
Contractor (example *sabey*)
City of Renton
Description (example *tourism*)
South 180th Street Grade Separation
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.4 In addition to the foregoing funding to be provided to the Project by Renton, Renton will pay <br /> Tukwila for those requested construction changes if they are betterment changes that change <br /> the scope of work or the approved construction plans and result in an increase in the project's <br /> cost. Renton will not be responsible for the costs of change orders that are due to unknown <br /> field conditions or design problems that are identified during the project construction. <br /> 6.5 In the event a lawsuit is instituted to enforce the payment obligations of Renton, the <br /> prevailing party shall be entitled to recover all costs of such a lawsuit, including reasonable <br /> attorney's fees. <br /> 7. DURATION/TERMINATION <br /> 7.1 This Agreement shall remain in effect until final acceptance of the Project, payment by <br /> Renton of all monies due from Renton to Tukwila, and completion of the wetland monitoring <br /> and maintenance period subject to the early termination provisions below. <br /> 7.2 If expected or actual funding is withdrawn, reduced or limited in any way prior to the <br /> completion of the Project, either party may, with 30 days written notice to the other party, <br /> terminate this Agreement. <br /> 7.3 In the event of termination prior to completion of the Project: <br /> 7.3.1 The party requesting termination shall pay all direct and indirect phasing -out costs. <br /> 7.3.2 Termination costs payable shall not exceed the actual costs incurred as a result of <br /> termination of the Project. <br /> 8. INDEMNIFICATION AND HOLD HARMLESS <br /> Washington State law shall govern the respective liability between the parties to this Agreement for <br /> any loss due to property damage or personal injury arising out of the activities conducted pursuant <br /> to this Agreement. <br /> Interlocal Agreement Page 8 of 10 <br /> Cm of Tukwila City of Renton <br /> S. 180 St Grade Separation <br />
The URL can be used to link to this page
Your browser does not support the video tag.