Laserfiche WebLink
<br />4 2 4 Work with property owners and development interests to ensure that the <br />ongoing structural integrity and flood protection performance of the Green <br />River Flood Control Zone District's levees and revetments will not be <br />compromised by local land use actions This shall include, at a minimum, <br />maintaining existing easement areas and /or tracts of land established for <br />this purpose Local land use actions shall also provide for the obtaining <br />of any additional easement areas or tracts of land reasonably necessary <br />to accommodate levee structural integrity and slope stability needs. Such <br />needs shall be determined in a manner consistent with applicable federal <br />levee engineering guidelines, and with any additional engineering or <br />geotechnical studies prepared for this purpose. <br />4 2.5 Coordinate flood hazard reduction planning and projects with the WRIA 9 <br />Forum's plans and projects relating to conservation and restoration of <br />salmon and salmon habitat, and other projects of mutual benefit. <br />4 2 6 Coordinate flood emergency preparedness, response and post- disaster <br />recovery throughout the Green River Flood Control Zone District. <br />4.2 7 Work directly with the U S Army Corps of Engineers to coordinate dam <br />operations and other flood damage reduction programs and projects <br />4 3 Green River Flood Control Zone District Administration In accordance with <br />and as authorized by Chapter 86 15 RCW, King County shall administer the <br />Green River Flood Control Zone District and serve as the lead administrative and <br />technical agency for the Executive and Technical Committees under this <br />Agreement. Certain employees of King County will be assigned to work on the <br />implementation of the goals and objectives of this Agreement. King County <br />further agrees to <br />Administration and Budget <br />4 3 1 Present for review by the Technical and Executive Committees the Green <br />River Flood Control Zone District's annual work program and budget. <br />4 3 2 Use funds raised within the boundaries of the Green River Flood Control <br />Zone District in a manner consistent with the purposes of Chapter 86 <br />RCW and the annual Resolutions authorized by the Board of Supervisors <br />that establish the annual budget and work program for the Green River <br />Flood Control Zone District. <br />July 2002 Page 6 of 17 <br />