Laserfiche WebLink
<br />other substantial activity by HWD on the Crest\ iel\ Site H W D <br />shall submit the plans and specifications to HSD and no work by <br />HWD shall be commenced without HSD's prior written approval <br />of the plans and specifications, which approval shall not be <br />unreasonably withheld, provided, however, that in the event of an <br />emergency requiring immediate action by HWD for the protection <br />of its facilities, persons or other property, HWD max take required <br />action upon such notice to HSD as is reasonable under the <br />circumstances <br />2.2. Any changes or revision to the plans and specifications approved <br />by HWD shall also be subject to HSD's approval Nothing in this <br />Agreement shall be deemed to impose any duty or obligation on <br />HSD to determine the adequacy or sufficiency of HWD's plans, <br />design and specifications, or to determine whether HWD's <br />construction is in conformance with the plans and specifications <br />approved by HSD <br />3 Construction, Alterations, Repairs and Maintenance. <br />3 1 HWD shall apply for a building and other required permits within <br />180 days of the date of this Agreement Construction shall be <br />commenced within 180 days after all required permits are issued <br />"Date of Commencement In any event construction must be <br />commenced within 18 months of the mutual acceptance of this <br />Agreement If construction has not commenced vs. ithin eighteen <br />(18) months of the mutual acceptance of this Agreement, either <br />HWD or HSD shall be entitled to terminate this Agreement on <br />written notice to the other thereafter As used herein, <br />"commencement of construction" shall mean that all applicable <br />permits have been obtained for construction of the Reservoir and <br />HWD shall have issued a notice to proceed to the contractor and <br />commenced excavation work with respect to the Reser\ oir <br />3 2. Construction of the Reser\ oir shall be completed IN ithin 18 <br />months after the Date of Commencement, subject to reasonable <br />extensions for inclement weather labor disputes strikes, acts of <br />God and other circumstances beyond the control of HWD In any <br />event the construction shall be complete within 3 ears of the Date <br />of Commencement <br />3 3 HWD shall construct the Reservoir in a good and workmanlike <br />manner, using materials meeting industry standards in accordance <br />HWVDK10 14/98 <br />3 <br />