Laserfiche WebLink
3 OPERATION OF INTERTIE <br />4 RATE <br /> <br />3 1 The operation of the intertie in the event of such emergency shall be as follows <br />3 1 1 The intertie valve is normally closed. The intertie will automatically open <br />whenever there is a significant pressure drop in either system. <br />3 1 2 In the event of an emergency that does not require immediate need for <br />water, the BUYER shall provide the SELLER with a description and <br />documentation of the emergency condition. Where feasible, the BUYER <br />shall provide at least a 24 -hour notification of the intended use, and open <br />the rnterte after 9 00 a.m. the following morning In the event that the <br />BUYER requests the intertie to be activated before 9 00 a.m., the BUYER <br />will provide the backup data necessary to the SELLER in order for the <br />SELLER to request and obtain a waiver of demand metering charges from <br />Seattle Public Utilities for the particular event, in accordance with the <br />water purveyor contract with Seattle However in the event that demand <br />metering charges are not waived, the BUYER shall pay the demand <br />metering charges incurred by the SELLER related to the event. <br />4 1 The BUYER shall pay the SELLER for all water delivered at the Seattle new <br />water wholesale rate plus other costs as computed below <br />4 1 1 The flow meter reading taken prior to activating the intertie shall be <br />subtracted from the meter reading taken either when the intertie is closed or at the next available <br />meter reading date The total water used during any event or billing period shall be calculated to <br />the nearest hundred cubic feet (ccf) If the total water used during a billing cycle is ten ccf or less, <br />the SELLER will not invoice the BUYER until the next consumptive billing cycle when <br />cumulative consumption exceeds ten ccf or the end year adjustment whichever comes first. <br />4 1.2 The SELLER shall multiply the calculated ccf times the new water <br />wholesale rate the SELLER pays Seattle in dollars per ccf times 1 17 (ccf x wholesale rate x <br />1 17) unless the event is subject to demand metering charges from Seattle Public Utilities, in <br />which event the charge shall be calculated as ccf time the demand metering rate times 1 17 (ccf x <br />demand metering charge rate x 1 17) This shall be complete payment for the water labor and <br />administration of activating the intertie <br />4 1 3 The SELLER shall then forward an invoice to the BUYER utility, and the <br />BUYER shall pay the invoice in full within thirty days of its issue In the event of non payment <br />by the BUYER within sixty days, an additional late charge of 10% of the amount past due shall <br />be added to the required payment. <br />