City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
05-053 - King County Water District #125 - Cascade View Improvement Construction Project
COT-City
>
City Clerk
>
Interlocal Agreements
>
2004-2009 Interlocal Agreements
>
05-053 - King County Water District #125 - Cascade View Improvement Construction Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/21/2011 9:53:38 AM
Creation date
10/4/2010 8:59:51 AM
Metadata
Fields
Template:
Interlocal Agreements
Contract No (example 17-139)
05-053
Contractor (example *sabey*)
King County Water District #125
Description (example *tourism*)
Cascade View Improvement Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
c i O C 4c` <br />INTERLOCAL AGREEMENT BETWEEN CITY OF TUKWILA AND <br />WATER DISTRICT 125 REGARDING CONSTRUCTION <br />OF WATER IMPROVEMENTS IN CONJUNCTION WITH THE CASCADE VIEW <br />IMPROVEMENT PROJECT <br />THIS AGREEMENT is entered into between the CITY OF TUKWILA, a Washington <br />municipal corporation "City and Water District 125 a Washington municipal corporation <br />"Water Distnct 125" or "District ")(individually a "Party" and collectively the "Parties <br />WHEREAS, the City is making nght -of -way improvements "City Work to Cascade View <br />Neighborhood, and <br />WHEREAS, Water District 125 has requested that certain water improvements "District <br />Work be constructed in conjunction with the City Work; and <br />WHEREAS, the Parties recognize the efficiencies of combining the City Work and the <br />District Work into one construction project (the "Project" or "Project Work whereby the nght- <br />of -way pavement will be disturbed only once. <br />NOW THEREFORE, in consideration of the terms and conditions contained herein, the <br />Parties agree as follows <br />1 SCOPE OF WORK <br />RECITALS <br />The City will advertise for bids and enter into a contract with a contractor for the <br />construction of the District Work as described and depicted on the Bid Documents dated <br />February 2005 for the Cascade View Improvement Project. <br />2. RESPONSIBILITIES OF THE PARTIES <br />A. WATER DISTRICT 125 <br />GUS ()53 <br />AGREEMENT <br />1) Water District 125 shall provide to the City engineered drawings, specifications, <br />construction standards, quantities, and cost estimates for the Distnct Work. The <br />drawings shall show in detail the location, quantity, and size of the piping, meters, <br />hydrants, and valve boxes. <br />2) Water District 125 shall review the portion of the Project's final drawings and <br />specifications for the District Work and shall approve or reject those drawings and <br />specifications within seven days of receipt. <br />C: \DOCIJME- 1 \imilne \LOCAI S- 1 \Temn \FINALW -1.DOC <br />358829100081315499 01 16rfv01!.DOC (3/9/053/8105) <br />to .l. <br />ENT'D 2 0 2005 OR GNA...S <br />
The URL can be used to link to this page
Your browser does not support the video tag.