City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
05-053 - King County Water District #125 - Cascade View Improvement Construction Project
COT-City
>
City Clerk
>
Interlocal Agreements
>
2004-2009 Interlocal Agreements
>
05-053 - King County Water District #125 - Cascade View Improvement Construction Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/21/2011 9:53:38 AM
Creation date
10/4/2010 8:59:51 AM
Metadata
Fields
Template:
Interlocal Agreements
Contract No (example 17-139)
05-053
Contractor (example *sabey*)
King County Water District #125
Description (example *tourism*)
Cascade View Improvement Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Contractor for work that has been completed by the Contractor and approved by Water <br />Distnct 125 and which Water Distnct 125 has agreed to pay under this Agreement. <br />G Defective or Unauthorized Work. Pursuant to the Project Contract between the City and <br />Contractor, Water District 125 reserves the nght to withhold payment from the City for <br />any defective, incomplete or unauthonzed work performed by the Contractor; provided, <br />Water Distnct 125 shall notify the City of its claim of defective, incomplete or <br />unauthonzed work pnor to the City making payment to the Contractor for such work. <br />For all work which is determined by Water District 125 to be defective, incomplete or <br />unauthorized after the City has paid the Contractor for such work, Water Distnct 125 <br />shall pay the City for such work provided that Water Distnct 125 shall not waive any <br />rights in doing so and any claims regarding the work shall be addressed as a claim against <br />the Contractor by Water Distnct 125 If a defect in the District Work is identified dunng <br />the one -year warranty period, the City will enforce the warranty provisions of the <br />Contract on behalf of Water District 125 Defective, incomplete or unauthonzed work <br />includes, without limitation. work and materials that do not conform to the requirements <br />of this Agreement, and extra work and materials furnished without Water District 125's <br />written approval. If for any reason it is necessary to satisfactonly complete any portion <br />of the work, Water Distnct 125 may complete the work using its own means and the <br />Contractor shall be liable to Water District 125 for any additional costs incurred by Water <br />District 125 "Additional costs" shall mean all reasonable costs, including legal costs and <br />attorney fees, incurred by the Parties beyond the pnce for the Distnct Work included in <br />the Contractor's bid accepted by the City Water District 125 further reserves the right to <br />offset the cost to complete the work, mcludmg any additional costs, from any and all <br />amounts due or to become due the Contractor <br />H. Final Acceptance. The City shall provide Water Distnct 125 with wntten notice of <br />completion of the Distnct Work. The District inspector shall perform final inspection of <br />the Distnct Work. The Distnct shall, within forty -eight (48) hours of its final inspection, <br />provide to the City written final acceptance of the District Work, or, alternatively, <br />provide an itemized and detailed response why final acceptance of the Distnct Work <br />cannot be given. If the Distnct fails to respond to the City within forty -eight hours, the <br />District shall be deemed to have given final acceptance of the Distnct Work. Upon final <br />acceptance of the Distnct Work, the City shall assign its nghts under the Project Contract <br />relating to the Distnct Work to the District, including any warranties and maintenance <br />obligations by and from the City's Contractor arising out of the Project Contract for the <br />District Work. The City shall also require the City's Contractor, as a condition of the <br />Project contract, to provide a maintenance bond at the District's cost to insure that the <br />Distnct Work is free from defects in workmanship and materials for a penod of one (1) <br />year following final acceptance of the Project Work by the City <br />I. As -Built Drawings The City shall provide the Distnct with "as built" drawings for the <br />District Work within thirty (30) days following the City's final acceptance of the Project <br />Work. <br />J Final Payment /Waiver of Claims The making of final payment by the Parties shall <br />constitute a waiver of claims by the Contractor, except those previously and properly <br />C: \DOCI7MF.-- 1 \imilne\i.00'ATS --1 \Temn \F[NAI,W- i .DOC <br />358829100081315499 .01I6rfv01!.DOC (3/9/053,8/03) <br />-4- <br />it.DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.