City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
05-086 - WA State Department of Transportation (WSDOT) - Tukwila Urban Access Improvement (Klickitat)
COT-City
>
City Clerk
>
Interlocal Agreements
>
2004-2009 Interlocal Agreements
>
05-086 - WA State Department of Transportation (WSDOT) - Tukwila Urban Access Improvement (Klickitat)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2010 7:04:23 PM
Creation date
10/4/2010 8:59:56 AM
Metadata
Fields
Template:
Interlocal Agreements
Contract No (example 17-139)
05-086
Contractor (example *sabey*)
WSDOT Department of Transportation
Description (example *tourism*)
Tukwila Urban Access Klickitat Improvement
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Agency City of Tukwila <br />Address 6200 Southcenter Boulevard <br />Tukwila, WA 98188 <br />The Local Agency having complied, or hereby agreeing to comply with the terms and conditions set forth in (1) Title 23 U S. Code Highways, (2) the <br />regulations issued pursuant thereto, (3) Office of Management and Budget Circulars A 102, A -87 and A 133 (4) the policies and procedures <br />promulgated by the Washington State Department of Transportation, and (5) the federal aid project agreement entered into between the State and <br />Federal Government, relative to the above project, the Washington State Department of Transportation will authorize the Local Agency to proceed on <br />the project by a separate notification. Federal funds which are to be obligated for the project may not exceed the amount shown herein on line r column <br />3 without written authority by the State, subject to the approval of the Federal Highway Administration. All project costs not reimbursed by the Federal <br />Government shall be the responsibility of the Local Agency <br />Project Description <br />Name Tukwila Urban Center Access Improvements (Klickitat) Length 0.23 <br />Termini <br />Description of Work <br />Design of a grade separated facility primarily at the Klickitat/Southcenter Parkway intersection. Southbound traffic on Southcenter Parkway will travel <br />under a partial lid suppdrting Klickitat Drive. Provisions would be made to accomodate turning movements both to and from Klickitat Drive and allow <br />for driver selection of most appropriate route as motorists approach the Southcenter Parkway /Strander Boulevard intersection. Southcenter Parkway will <br />be widened to the east, toward Southcenter Mall No changes to the 1 -5 off -ramps are anticipated. A new signal at the Klickitat Drive /SB 1 -5 On -ramp on <br />the west side of 1 -5 will also be included. <br />PE <br />100 <br />Federal Aid <br />Participation <br />Ratio for PE <br />Right of Way <br />Federal Aid <br />Participation <br />Ratio for RW <br />Construction <br />Federal Aid <br />Participation <br />Ratio for CN <br />Washington State <br />Department of Transporta.. <br />Type of Work <br />a Agency <br />b. Other Consultant <br />c. Other <br />d State <br />e Total PE Cost Estimate (a +b +c +d) <br />f Agency <br />a. Other <br />h Other <br />i State <br />j Total R/W Cost Estimate (f +q +h +i) <br />fr Contract <br />I Other <br />m Other <br />n Other <br />o Agency <br />p State <br />q Total CN Cost Estimate (k +I +m +n +o +p) <br />r Total Project Cost Estimate (e +j +q) <br />Agency Offic'al <br />By <br />Title Mavnr <br />DOT Form 140 -039 EF <br />Revised 01/2004 <br />Washington State Department of Transp rtation <br />c <br />By <br />1 <br />Project No <br />Agreement No <br />Date Executed <br />Luca ,-agency Agreement <br />CFDA No 20.205 <br />(Catalog of Federal Domestic Assistance) <br />STPD- ko Yt( <br />LA 595 0 <br />Estimate of Funding <br />(1) <br />Estimated Total Estimated Agency Estimated <br />Project Funds Funds Federal Funds <br />1 <br />651,333 00 i 651,333 001 <br />1 <br />10,000 00 10,000 001 <br />661,333 00 661,333 001 <br />661,333 001 <br />For OSC WSDOT Use Only <br />Assistant Secretary for Highways and Loc 6�po n <br />rY `L, 7 /L -on5 <br />661,333 001 <br />
The URL can be used to link to this page
Your browser does not support the video tag.