06-016(c)
<br /> Council Approval NIA
<br /> MAP a�'°'t„,, A E L Agency Agreement Supplement
<br /> Agency Supplement Number
<br /> City of Tukwila 3
<br /> Federal Aid Project Number Agreement Number
<br /> HPP- 999(475)
<br /> LA 6040 CFDA No. 20.205
<br /> The Local Agency desires to supplement the agreement entered into and executed on March 10. 2006
<br /> All provisions in the basic agreement remain in effect except as expressly modified by this supplement.
<br /> The changes to the agreement are described as follows:
<br /> Project Description
<br /> Name Tukwila Urban Access Improvement Length 0.23
<br /> Termini
<br /> Description of Work No Change
<br /> Reason for Supplement
<br /> Reallocating CN funds back to PE for additional design work for the sign bridge required by WSDOT NW Region Traffic. Additional
<br /> PE work is also required to complete PIFs on proprietary items used in the bid documents. Additional PE effort is required to complete
<br /> minor redesign of the storm line to avoid a shared utility duct bank which cannot be relocated in a fiscally responsible manner. Revise
<br /> Construction funds to segregate CM costs from actual construction. Reduce TIB grant award to reflect the final awarded amount.
<br /> Revision of state forces line item to cover outstanding charges and estimated future charges.
<br /> Does this change require additional Right of Way or Easements? Yes No
<br /> Estimate of Funding
<br /> Type of Work (1) (2) (3) (4) (5)
<br /> PREVIOUS AGREEMENT/ SUPPLEMENT ESTIMATED TOTAL ESTIMATED ESTIMATED
<br /> SUPPLEMENT PROJECT FUNDS AGENCY FUNDS FEDERAL FUNDS
<br /> P.E. a. Consultant HPP $1,564,824 $1,564,824 $1,564,824
<br /> b. Other Consultant STP $108,000 $108,000 $14,580 $93,420
<br /> Federal Aid c. Other State STP $22,700 $22,700 $3,065 $19,635
<br /> d Other State HPP $10,000 $10,000 $10,000
<br /> e Total PE Cost Est. (a thru e) $1,574,824 $130,700 $1,705,524 $17,645 $1,687,879
<br /> Right of Way f Agency $2,388,500 $2,388,500 $2,388,500
<br /> g Other
<br /> Federal Aid h Other
<br /> Participation i State I I I I I
<br /> Ratio for Rw j Total R/W Cost Est. (f thru j) $2,388,500 $2,388,500 $2,388,500
<br /> Construction k CH2MHill /HNTB STP (CM) $651,409 $651,409 $87,940 $563,469
<br /> 1 Local funds (CM) f $1,543,790 $1,543,790 $1,543,790 i
<br /> m Other STP $3,448,208 $782,109 $2,666,099 $359,923 $2,306,176
<br /> n Other Int Corridor Safety $250,000 $250,000 $250,000
<br /> o Other TIB, LID $10,819,412 $1,601,284 $9,218,128 $9,218,128
<br /> Federal Aid p Agency $2,506,000 $315,346 $2,190,654 $2,190,654
<br /> Participation q State $20,000 $20,000 $2,700 $17,300
<br /> Ratio for CN r Total Const. Cost Est. (k thru q) $17,043,620 $503,540 $16,540,080 $13,403,136 $3,136,944
<br /> s.Total Project Cost Estimate (e +j +r)l $21,006,944 I ($372,840) $20,634,104 $15,809,281 $4,824,823
<br /> The local agency further stipulates that pursuant to said Title 23, regulations and policies and procedures, and as a condition to payment of the
<br /> Federal funds obligated, it accepts and will comply with the applicable provisions.
<br /> Agency Official Wash'ngton Sta De artment of Tra portation
<br /> B By
<br /> Title Vyor 1W Director of Highwa s and Local Programs
<br /> V
<br /> 1 Lt )4 Date Executed JAN 10 2011
<br /> DOT Form 140 -041 EF /mod
<br /> Revised 1/2007 6 1 /Lf,9-6�
<br />
|