City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
06-017 - WA State Department of Transportation (WSDOT) - Tukwila Urban Access Improvement Project
COT-City
>
City Clerk
>
Interlocal Agreements
>
2004-2009 Interlocal Agreements
>
06-017 - WA State Department of Transportation (WSDOT) - Tukwila Urban Access Improvement Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2010 7:04:27 PM
Creation date
10/4/2010 9:00:04 AM
Metadata
Fields
Template:
Interlocal Agreements
Contract No (example 17-139)
06-017
Contractor (example *sabey*)
WSDOT Department of Transportation
Description (example *tourism*)
Tukwila Urban Access Improvement WA152
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6(0 <br />Washington State <br />i Department of Transportation AGENCY Local Agency Agreement Supplement <br />Agency Supplement Number <br />City of Tukwila 1 <br />Federal Aid Project Number Agreement Number CFDA No 20.205 <br />HPP- 9999(474) LA 6039 (Catalog of Federal Domestic Assistance) <br />The Local Agency desires to supplement the agreement entered into and executed on March 10, 2006 <br />All provisions in the basic agreement remain in effect except as expressly modified by this supplement. <br />The changes to the agreement are described as follows: <br />Project Description <br />Name Tukwila Urban Access Improvement Project Length 0.23 <br />Termini <br />Description of Work No Change <br />Reason for Supplement <br />Obligate the 2009 HPP allocation <br />PE <br />100 <br />Federal Aid <br />Participation <br />Ratio for PE <br />Right of Way f. Agency <br />a. Other <br />Federal Aid h. Other <br />Participation <br />Ratio for RW I. State <br />j. Total R/W Cost Estimate (f +g +h +i) <br />Construction. <br />k. Ccntra:,i <br />I. Other <br />m. Other <br />n. Other <br />o. Agency 1 <br />p. State <br />q. Total CN Cost Estimate (k+l+m+n+o+p) 1 <br />r Total Project Cost Estimate (e+l+q) 1 <br />Federal Aid <br />Participation <br />Ratio for CN <br />Agency Official <br />By <br />Title Ma <br />Type of Work <br />a. Agency <br />b. Other Consultant <br />c. Other <br />d. State <br />e. Total PE Cost Estimate (a +b +c +d) <br />A QA 3 1 )01 <br />DOT Form 140 -04 EF <br />Revised 4/2000 <br />Previous <br />Agreement/Suppl. <br />1 1 1 1 <br />1 674,380.00 35,541 001 709,921 001 <br />1 1 <br />10,000 001 1 10,000.00 <br />684,380.001 35,541.00 719,921.00 <br />684,380.001 <br />The Local Agency further stipulates that pursuant to said Title 23 regulations and policies and procedures, and as a condition <br />to payment of the Federal funds obligated, it accepts and will comply with the applicable provisions. <br />Washington State D artment of Transportation <br />;7,7_ <br />By <br />(2) <br />Supplement <br />Estimate of Funding <br />(3) (4) (5) <br />Estimated Total Estimated Agency Estimated <br />Project Funds Funds Federal Funds <br />35,541.001 719,921.001 <br />Date Executed <br />Assistant Secretary for Highways and Local Programs <br />709,921 00 <br />10,000.00 <br />719,921.00 <br />719,921.00 <br />AUG 1 3 2009 <br />
The URL can be used to link to this page
Your browser does not support the video tag.