3 -16 -07
<br />Tukwila Pond Interpretive Trail
<br />City of Tukwila, WA
<br />Project Scope of Work Fee
<br />Tasks
<br />Phase 1
<br />1 00 Schematic Design 35% Submittal
<br />1 01 Site Visit 1,600.00
<br />1 02 Wetland Delineation 6,800 00
<br />1 03 Boundary and Design Survey 30,260 00
<br />1.04 Concept Plan Cost Estimate 9,740.00
<br />1.05 PreSubmission Conference w/ Tukwila 970 00 4
<br />Task Total 49,370.00
<br />X 2.00 Permit Submittal Processing 55%
<br />2.01 Layout/Grading Plans
<br />2.02 Boardwalk Plan and Details
<br />SEPA and JARPA Permitting /Processing,
<br />2.03 Biological Assessment
<br />2.04 Illustrative Plan
<br />2.05 Public Presentation of Tukwila Pond Trail 920 00 1 8 920 00
<br />task Total 30,880.00 1
<br />3.00 Meetings Project Coordination
<br />Project Management via phone, fax, email,
<br />3.01 etc
<br />Total
<br />21,680 00 40 4,600 00
<br />920.00 8 920.00
<br />Attachment B
<br />Wetland Biological
<br />RWD Delineation Assessment Survey Electrical Structural
<br />ine
<br />Bob Droll /Project The Coot Watershed Larson MC
<br />Manager Land. Tech 111 Clerical Company Company Associates BCE Squared
<br />hours: total hours total :hours total total total total total total
<br />8 920.00 8 680.00
<br />4 460 00 4 340 00 6,000.00
<br />8 920.00 4 340.00
<br />16 1,840.00 40 3,400.00
<br />460.00 6 510.00
<br />2,270 00 2 230.00 24 2,040.00
<br />5,090.00 2 230 00 16 1,360 00
<br />48, 4,080 00
<br />3,470.00 24 2,760 00 2 170 00 12 540 00
<br />iask Total
<br />3,470.00
<br />13,000 00
<br />29,000 00
<br />3,000.00 1,500.0
<br />3,500 00
<br />Tasks Subtotal 83,720.00 11,500 00 12,750 00 540 00 6,000 00 13,000 00 29,000.00 3,000 00 5,000.00
<br />Direct Expenses (plots, phone, reproduction,
<br />mail, travel) 1,500 00
<br />Subconsultant Administration 5,600 00
<br />'Professional Services Fee Total 90,820.00
<br />Robert W Droll, Landscape Architect, PS 360 456.3813
<br />
|