City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
07-082 - Robert Droll Landscape Architecture - Tukwila Pond Park Development
COT-City
>
City Clerk
>
Interlocal Agreements
>
2004-2009 Interlocal Agreements
>
07-082 - Robert Droll Landscape Architecture - Tukwila Pond Park Development
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2010 7:04:34 PM
Creation date
10/4/2010 9:00:26 AM
Metadata
Fields
Template:
Interlocal Agreements
Contract No (example 17-139)
07-082
Contractor (example *sabey*)
Robert Droll Landscape Architecture
Description (example *tourism*)
Tukwila Pond Park Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Attachment A <br />Tukwila Pond Trail Tukwila Parks Recreation 4/24/2007 <br />'Task 4.04 I3aartlwa![c i'1un cC Detain; <br />Iioar(I va I k Plan \A ill d4fine the hori/ontai and \erticaI alignment of lioard\vali., Inch ant kti rnteJ to <br />be I,Cate:d o\er the \natter in locations \h:•rc there H intiullit i. nt rnihlie i)roPctt\ to IoCat�` the trail ut <br />an u1\lant.! area 121'\ I) \rill pro\ Ide all t!c1aik and t.a1,_Illaltlt(n. 1,1 e utnpI\ li tea! odes, \I)' <br />regulations alit( internal Buil(inn ocle. <br />Task 4.05 Site Details <br />Prepare details liar lrro eet sue Intmo\entcnts, <br />Tasks 4.06 Fstititate of l'rol able t'll;ts <br />It11'l) A\ ill hro\addc 1_siiinate or Probable (ost hand .1 nlea iant ie RV I) ill t /e <br />1,:.timate by I rail cgnlcnt to allu\\ (`!lent to rcnicr 1'ita;:itt( deeikiun it'ne,est,tir\ Ii;unlalc' 1; ill <br />in dndc itll Proieet Development Cost, including Lt)tlstllt;Wt •.t1,t,. construction atlitlilli`,Irall(In, <br />rllobili /alto!!. ht)n(l1. Conlint taxi's. projected construction year cot Csealation (11 ile'i....essar\ <br />ia.\t:s and all ideniilrt:d costs associated tth this hniject' de\ elopmeni <br />Task 4.07 Review with Staff <br />Re\ ie:\\' flans \-ith titafli <br />Task 5 Final Design 90% Sulatttittatl <br />Tasks 5.01 -5.06 are the same Tasks as 4.01 -1M6 except Work, \till be al a 90% completion le\ el. <br />Task 5.07 Specifications <br />Prepare I cehmeal (1o,.Ittcaitions Se.ci:ons oustrnctik n (weenie,' am lli,tillil(' ",1) rormut. <br />Task 5.08 Revic\\ with Staff <br />ReAk\\ Plans with `)tali. <br />'Task 5.09 Building Permit :11r1;licatt. in <br />RW1) ill submit and process ltuildiuo Permit at)Iyfit'attons <br />Task 5.10 Quality Re icax <br />Rl1'1) will retain a (.'oncdruetiou Ntluttat t:) re is .i <'t l bits documents <br />'Task 6 t.ontraet Document 100% Snlnnrirta1 <br />Tasks 6.01 -6.07 are the same Tasks as 5.01 -5.07 except NA orb, ill be at a 100 completion level <br />and ready for kdvevtising and bidding. <br />Task 6.08 Assemble 1)riiver Documen <br />RW I) asseauble t `'peciticaiions and Plans in lal(lormat and ioritard ill (.!tent <br />Robert W Droll, Landscape Architect, PS, 4405 7'" Avenue, Lacey, WA, SE, 98503, 360 456.3813, bob @rwdroll.com 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.