Laserfiche WebLink
TIB Ph2 /3 (95- RW -03) <br />Exhibit A Scope of Work WD 125 Water System Work <br />The following Scope of Work will be included in the Project Work following the <br />execution of a Coordination Agreement for the Project listed above. The District will be <br />responsible for paying these costs by compensation to Tukwila as detailed in the <br />Coordination Agreement and the relevant attachments. Additional costs may be assessed <br />to the District as allowed by the Agreement and /or as detailed below. <br />See MEASUREMENT AND PAYMENT section below for detailed descriptions of Bid <br />Items <br />BID SCHEDULE D <br />ITEM ITEM QUANTITY UNIT TOTAL <br />NO DESCRIPTION PRICE AMOUNT <br />1 8" Class 52 D I RJ, Pipe Fittings <br />(w /full depth crushed rock) 196 LF <br />Price in Words <br />2 Connection to Existing Water Main <br />Price in Words <br />3 Additional Fittings <br />Price in Words <br />4 8" HMA Pavement Patch <br />Price in Words <br />5. 6" HMA Pavement Patch <br />Price in Words <br />6 Plug Existing Main <br />Price in Words <br />7 18" Steel Casing <br />Price in Words <br />8 Trench Safety <br />Price in Words <br />2 EA <br />500 LBS <br />100 SY <br />105 SY <br />1 EA <br />9 LF <br />LS <br />S \TIB Phase 2 &3 95- RW03 005 Design Review \Utility Coordination \3rd Party Coordination Agreements \TIB Ph2 &3 WD125 <br />Coordination Agreement Exhibit A.doc 06/19/2008 <br />Page 1 of 4 <br />