City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
08-071 - Valley View Sewer District - Tukwila International Boulevard Phase II & III Sewer Facility Adjustments
COT-City
>
City Clerk
>
Interlocal Agreements
>
2004-2009 Interlocal Agreements
>
08-071 - Valley View Sewer District - Tukwila International Boulevard Phase II & III Sewer Facility Adjustments
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2011 1:40:38 PM
Creation date
10/4/2010 9:01:22 AM
Metadata
Fields
Template:
Interlocal Agreements
Contract No (example 17-139)
08-071
Contractor (example *sabey*)
Valley View Sewer District
Description (example *tourism*)
TIB Tukwila Intl Blvd Sewer Facility Adjustme
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1. SCOPE OF WORK <br />RECITALS <br />AGREEMENT <br />COORDINATION AGREEMENT BETWEEN THE CITY OF TUKWILA AND <br />VALLEY VIEW SEWER DISTRICT <br />REGARDING SEWER FACILITY ADJUSTMENTS IN CONJUNCTION WITH THE <br />TIB Phase 2 &3 STREET IMPROVEMENT PROJECT (95- RW -03) <br />THIS AGREEMENT is entered into between the CITY OF TUKWILA, a Washington <br />municipal corporation "City and Valley View Sewer District a Washington municipal <br />corporation "Valley View" or "District ")(individually a "Party" and collectively the "Parties <br />WHEREAS, the City is making right -of -way improvements "City Work to Tukwila <br />International Blvd between S139th and S116th Way; and <br />WHEREAS, Valley View Sewer District has requested that certain sewer facility adjustments <br />"District Work be made in conjunction with the City Work; and <br />WHEREAS, the Parties recognize the efficiencies of combining the City Work and portions <br />of the District Work into one construction project (the "Project" or "Project Work whereby the <br />right -of -way pavement will be disturbed only once. <br />NOW THEREFORE, in consideration of the terms and conditions contained herein, the <br />Parties agree as follows: <br />The City will advertise for bids and enter into a contract with a contractor "Contractor <br />for the construction of the District Work as described and depicted on the Bid Documents <br />dated June 2008 for the TIB Phase 2 &3 Project. <br />2. RESPONSIBILITIES OF THE PARTIES <br />A. VALLEY VIEW SEWER DISTRICT <br />1) Valley View Sewer District shall provide to the City any engineered drawings, <br />specifications, construction standards, quantities, and cost estimates required for the <br />District Work. The drawings shall show in detail the location, quantity, and size of <br />the piping, side services and manhole structures. <br />2) Valley View Sewer District shall review the portion of the Project's final drawings <br />and specifications for the District Work and shall approve or reject those drawings <br />and specifications in writing within seven (7) days of receipt. Failure to respond <br />within the prescribed review period will signify the District's approval of the final <br />contract documents. <br />S:\TIB Phase 2&3 95- RWO3t#.005 Design ReviewtUtiility Coordination\3rd Party Coordination Agreements\TJB Ph2&3 ValView <br />Coordination Agreement 06- 19- DS.doc (Printed 6/19/08) Page 1 of 9 <br />s f a f o Og16 iAM -e-S <br />
The URL can be used to link to this page
Your browser does not support the video tag.