Laserfiche WebLink
areas will be the tan color on the top third of the building will be projected out 8" <br />along with the stone covered pilaster at the NE corner, and a darker brown on <br />the lower 2/3's with a projecting band of off white separating the two areas. The <br />wall will top off with a matching decorative cornice in the off white color with top <br />of parapet at 23' -0" AFF. <br />The South elevation of the building will face the parking areas. The building entry <br />doors will be located near the SE corner of the building with a pedestrian <br />sidewalk connecting the building and Tukwila International Blvd. right of way. <br />The doors are located in the 24' -6' tall projected vestibule area with pilasters, <br />windows and flat awnings which will turn the corner from the East elevation. The <br />remaining wall area is broken up into three sections with 8" projected areas that <br />that top out with the decorative cornice at 23' -0" AFF and the center section <br />topping out at 21' -0 ". This area also will have three decorative metal grilles in the <br />dark bronze color as an accent to break up the wall area. Paint Schemes, wall <br />base and pilaster construction will match the East elevation. <br />The west elevation is where the loading door will be located and away from <br />Tukwila International Blvd. visibility. The 23' -0 tall x 8" thick projected area with <br />split face masonry pilasters on either side of the loading door. The remaining wall <br />area will match the 21' -0" AFF main building wall and will be finished with stucco <br />in tan color on the top third of the building and a darker brown on the lower 2/3's <br />with a projecting band of off white separating the two areas to match the East <br />and South elevations. <br />The north elevation will face the required 10' wide side yard landscape buffer. <br />This elevation is divided into four sections by split face masonry pilasters which <br />project out from the main building wall 8 ". The section at the NE corner of the <br />building will have the top 1/3 of the wall projected out to mirror the area just <br />around the corner on the East elevation and will top out at 23' -0" AFF. The <br />remainder of this elevation will top out at 21' -0" and will be finished with stucco in <br />tan color on the top third of the building and a darker brown on the lower 2/3's <br />with a projecting band of off white separating the two areas. The base will have <br />the stone veneer and the top of wall will have the decorative cornice. <br />Screening <br />The service — loading area for this facility has been placed towards the rear of <br />the lot with a required landscape buffer provided between the area and the rear <br />property line. A 6' tall masonry wall designed to match building construction and <br />colors is proposed to screen the trash receptacles. Doors to the enclosure will be <br />opaque and painted to match the building. The HVAC units servicing this building <br />will be located on the roof and will be fully screened from view on all sides by the <br />building parapets. The Building will be equipped with internal roof drains <br />therefore no downspouts or scuppers will be visible. <br />16440.005.doc <br />47 <br />