Laserfiche WebLink
FCD Resolution <br />63 side at the four outside bends of Green River between South 200thh and South 180th <br />64 Streets in the Cities of Kent and Tukwila and incorporating the conditions and <br />65 responsibilities of this Resolution. <br />66 .SECTION 4. For the Briscoe - Desimone levee project, the District supports the <br />67 use of setback levees that are retained by walls on the landward side. The following <br />68 conditions must be met: <br />69 A. The design and installation of the Briscoe Desimone levee project shall be <br />70 consistent with applicable state and federal regulations and standards, including but not <br />71 limited to the state Shoreline Management Act, the federal Clean Water Act, and state <br />72 water quality standards, and shall receive all necessary local, state, and federal permits. <br />73 B. The top of the setback levee retaining wall shall be consistent with the height <br />74 of the adjoining levee sections. <br />75 C. The city of Kent's ( "City ") responsibilities and conditions in relation to the <br />76 Briscoe - Desimone levee project are as follows: <br />77 1. The City, or its engineering consultants, shall submit to the District a <br />78 plan to provide for resiliency of the landside levee and wall in the event of overtopping. <br />79 The plan should include identification of the areas that are most susceptible to erosion, <br />80 such as the base walls and valleys on the landside slopes of Briscoe- Desimone Levee at <br />81 the bends. <br />82 2. The City shall reduce and mitigate the potential for erosion. The City, <br />83 or its engineering consultants, shall identify permanent or temporary strategies to <br />84 minimize erosion in these locations of potential erosion. <br />4 <br />