Laserfiche WebLink
111 <br />eeeeeeeeee1e 111111 <br />11111111 111111011111 <br />111111 1111 1111111111 1111 111111 III f <br />111 111 111111111 1111111111111111 11 <br />� IMIIIIIIIII 1111111 11111111 1111111111111 1111111111" <br />PI I 01 011111111111111110000001 11111111111111111111111111111111111111111 <br />l�lo 11111111111111111111 1 11 11111111111111111111111111111111111111111111111111111111111111111111111111111 <br />IMO I 11111111111111111111111111111 <br />meei <br />ooll <br />dole <br />M <br />.111 <br />1000011111111001„. <br />'��W l'VV'ill 10101011111111101111 <br />' 111,1111111111, <br />111111111 1,1,11,1,1,1,1)111,111,11111,111 <br />Example of scale of concrete wall on south side <br />c. Building Elements, Details, and Materials <br />In respect to Building Elements, Details and Materials, the proponent has worked with <br />the massing of the buildings, which is very large, with mitigating elements such as projecting <br />bays of varying heights and angles, a variety of materials and colors, a variety of fenestration <br />types, and variations in detailing. <br />Building D <br />The metal panel siding at the corner of TIB and S. 144th Street on Building D, together with <br />the change to a commercial window detail, makes an excellent corner statement at the <br />intersection. (Sheet P2.10, Attachment A). The selection of the copper accent color <br />accentuates the impact with its boldness. <br />The massing of the metal clad articulated corner rests on the northwest corner column. The <br />column, which is a 16 x 20 tube steel with (3) six inch arms, is not load bearing and could be <br />removed; however, the proponent wants this styling to be a unifying detail throughout <br />Tukwila Village. <br />The "flying eave" at the top floor corner adds an interesting visual element to an otherwise <br />uneventful top floor. The size of the steel channel is large enough to be a substantial <br />element and it is painted to match the accent copper color. <br />L13 -0044 — Tukwila Village Phase 2 Page 121 <br />25 <br />