City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
Planning 2014-03-27 COMPLETE AGENDA PACKET
COT-City
>
City Clerk
>
Boards and Commissions
>
Planning Commission
>
Planning Commission Agenda Packets
>
2011-2019 Agenda Packets
>
2014-03-27 Planning Commission - Tukwila Village Phase II Design Review
>
Planning 2014-03-27 COMPLETE AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2014 10:57:57 AM
Creation date
3/20/2014 9:31:53 AM
Metadata
Fields
Template:
Boards and Commissions
Date (mm/dd/yy)
03/27/14
Board or Commission Name
Planning Commission
Agenda or Minutes
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
There are a number of doors around the ground floor of the building that are shown as grey. <br />(Sheets P3.7, P3.8, Attachment A) <br />d. Pedestrian - Oriented Features <br />Storefront glass system in bronze is proposed for the commercial facade on Building D and <br />E. Building wall articulation, benches, trash receptacles, wall sconces, and awnings are <br />features that enhance the pedestrian experience on the west, south and eastern sides of <br />Building A. Paved connections with the street sidewalk are continuous. <br />Large blank walls are limited to the west and south elevations of Building E. Green screens, <br />or metal frames attached to the walls incorporate landscaping and create vertical trellises <br />primarily along walls facing the driveway between the two buildings. (Sheets P2.20 and <br />P3.8, Attachment A) <br />The gates over the two openings to the garages are 25 feet wide. Pictures of the proposed <br />gate and screen are included above. <br />e. Mechanical Equipment <br />A transformer pad is dashed in at the southwest corner of Building E. No screening is <br />shown. According to the proponent, the mechanical system has not yet been designed; <br />although the direction is that the mechanical system for Building D will be located inside the <br />garage and in the office space and that there will be HVAC condenser units located outside <br />along the SE end of the building. Electrical meters will be inside the garage /buildings. Gas <br />meters will likely be placed at the SE end of D and SW end of E. <br />3. Landscape Design <br />a. Landscape Design <br />There is limited public landscape in Phase 2, primarily along the perimeter of the site. There <br />is a significant roof terrace in Building E, which is recreation space for the tenants <br />(Attachment P3.21, Attachment A) A significant use of pots for plants is used along the <br />fronts of the both Building D and E. A distinctive steel landscape bed edging is proposed <br />from the commercial corner entrance to Building D around the north side of the building. <br />The steel edge will vary in height from approximately 4 feet to 2 feet. (Drawings 4 and 8, <br />Sheet P3.40, Attachment A) <br />Due to elevation differences there are a number of concrete walls that will be created to <br />shape the site around south side of Building D. Sheet P2.0, Attachment A shows the wall <br />details along the south property line. Walls will be limited to 4 feet in height and two sets <br />L13 -0044 — Tukwila Village Phase 2 Page 124 <br />28 <br />
The URL can be used to link to this page
Your browser does not support the video tag.