City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
Planning 2014-03-27 Item 4 - Tukwila Village Phase II - Attachment D: Parking Notice of Decision
COT-City
>
City Clerk
>
Boards and Commissions
>
Planning Commission
>
Planning Commission Agenda Packets
>
2011-2019 Agenda Packets
>
2014-03-27 Planning Commission - Tukwila Village Phase II Design Review
>
Planning 2014-03-27 Item 4 - Tukwila Village Phase II - Attachment D: Parking Notice of Decision
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2014 1:41:14 PM
Creation date
3/20/2014 1:41:14 PM
Metadata
Fields
Template:
Boards and Commissions
Date (mm/dd/yy)
03/27/14
Board or Commission Name
Planning Commission
Agenda or Minutes
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Phasing Plan and Parking Supply <br />Because this is a large project that will be built over two — three years, (Attachment E) staff <br />considered the implications of parking demand and supply during the phasing period. Attachment <br />F shows that parking supply requirements, per the Zoning Code, are not evenly distributed between <br />the five lots — hence the need for a shared parking decision. The applicant respond with the <br />following solutions. (Attachment G) <br />Phase 1 has the largest deficit of spaces. The Phase 1 - 73 stall deficit - becomes reduced by a 30 <br />stall surplus produced by Phase 2 completion on the south side of S. 144 Street. Phase 3 <br />completion brings the project into compliance and creates a 2 stall surplus. To mitigate the <br />temporary Code shortage, the applicant discusses the construction of 18 on -street parking stalls in S. <br />144in Street, which is to be completed as part of Phase 1; their proposal to have temporary parking <br />on proposed Lot B that would be available upon Phase 1 completion (Attachment H;) and the seven <br />month absorption period for Phase 1 residential units and 17 month absorption for all the <br />commercial space in Building A. The currently proposed completion of Phase 2 is within five <br />months of the completion of Phase 1 and Phase 3 is within 12 months. <br />It is not until all three phases are built that the project will meet the requirements of the Parking <br />Code. In the end, at full build -out, the project meets the Code requirements for parking supply. Per <br />the DDA, the City as property owner, must approve a phasing plan for development and can <br />consider any parking issues related in the long term to a phase plan of development. (See Section <br />2.4 of the DDA Phasing; Development Parcels) <br />Parking Supply Alternatives <br />Transportation options <br />Two Metro Bus Routes provide immediate access to the site. Route 128 stops on S. 144 Street <br />and travels approximately every 15 minutes between West Seattle and Southcenter and serves <br />the Light Rail station. Route 124 stops on Tukwila International Blvd (TIB) and travels <br />approximately every 15 minutes during peak periods between the Light Rail station at <br />Southcenter Boulevard and downtown Seattle. <br />The intention of the requirement for a Transportation Demand Management Plan (discussed <br />below) is to assist site residents and users in taking these transportation alternatives. <br />Transportation Demand Management <br />The project is within the Urban Renewal Overlay District and the developer has chosen to utilize the <br />standards of the overlay zone. Those standards come with a requirement to submit a Transportation <br />Management Plan, with is a transportation demand management tool. <br />The Code says, "The property owner /manager shall prepare a Transportation Management Plan <br />(TMP) to encourage alternatives to automobile use, and that provides each residential and <br />commercial tenant with materials that may range from offering information about transit and <br />Staff Report <br />L13 -031 <br />Page 9 of 12 <br />105 <br />
The URL can be used to link to this page
Your browser does not support the video tag.