City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
Planning 2013-06-24 COMPLETE AGENDA PACKET
COT-City
>
City Clerk
>
Boards and Commissions
>
Planning Commission
>
Planning Commission Agenda Packets
>
2011-2019 Agenda Packets
>
2013-06-24 Planning Commission and City Council - Special Joint Work Session
>
Planning 2013-06-24 COMPLETE AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2017 12:36:02 PM
Creation date
3/27/2014 9:38:19 AM
Metadata
Fields
Template:
Boards and Commissions
Date (mm/dd/yy)
06/24/13
Board or Commission Name
Planning Commission
Agenda or Minutes
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
155
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TUKWILA COMPREHENSIVE PLAN <br />The Natural Environment <br />(mostl non- native red -eared slidersi ,Lister snakes amphibians ( non - <br />native bullfrogs, native Pacific Tree frogs and dsalamanders , opossum„ <br />andraccoons. (Picture of osprey ar _ro <br />Flood Management <br />Tukwila's urban center the light industrial and manufactunn, area „south <br />of S 180'h Street, part of Tukwila South, and Fort Dent Park are,protected <br />from flooding of the Green River bevee systems. The City articipates <br />in the National Flood Insurance Program administered by the Federal <br />Emergency Management Agency il~EMA),,,which has mapp„ ed regulated <br />flood _plains in Tukwila. Ma ; ed flood lains and the levee system are <br />explained in more detail in the Shoreline Element of the Com, rehensive <br />Plan. <br />Impervious surfaces and the elimination of natural wetland functions have <br />,m, <br />caused localized flooding from streams .eriodicall at va ying levels of <br />severit; on some of public right -of -way, as well as on private <br />Topertieswhere inadequate or no surface water infrastructure exists. The <br />City has resolved_ many of the floodmg problems through improvements to <br />surface water infrastructure. For example, periodic flooding from Gilliam <br />Creek near Southcenter Boulevard was resolved through the construction <br />of a regional detention facilij „that serves the area of Southcenter <br />Boulevard west of Interstate 5. The surface water manement system <br />(surface waterutilityl is described in more detail in the Utilities Element,,, <br />of the Comprehensive Plan More detailed information on localized <br />flooding problems is provided in Cites Comprehensive Surface Water,,, <br />Management Plan,, <br />December 201 <br />
The URL can be used to link to this page
Your browser does not support the video tag.