City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
14-081 - King County Water District #125 - Utility Relocation (East Marginal Way South Storm Pipe Replacement)
COT-City
>
City Clerk
>
Interlocal Agreements
>
2010-2015 Interlocal Agreements
>
14-081 - King County Water District #125 - Utility Relocation (East Marginal Way South Storm Pipe Replacement)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2014 3:03:29 PM
Creation date
7/3/2014 4:11:59 PM
Metadata
Fields
Template:
Interlocal Agreements
Contract No (example 17-139)
14-081
Contractor (example *sabey*)
King County Water District #125
Description (example *tourism*)
Utility Relocation - EMWS Storm Pipe
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Proposal <br />EXHIBIT 3 <br />P -12 <br />East Marginal Way S Storm Pipe Replacement - Project No. 91241206 <br />Note: Unit prices for all items, all extensions, and the total amount bid must be shown. Where conflict occurs between the unit price <br />and the total amount specified for any item, the unit price shall prevail, and totals shall be corrected to conform thereto. Refer to <br />Division 10 for definition of pay items. The Contractor shall collect from the Contracting Agency retail sales tax on the <br />SCHEDULE D contract price per section 1. 07.2(2) and WAC 458 -20 -170. <br />SCHEDULE D - WATER MAIN RELOCATION <br />Item <br />No. <br />Item Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />D1 <br />Minor Change for Water Main Relocation <br />1 <br />FA <br />$ 10,000.00 <br />$ 10,000.00 <br />D2 <br />Mobilization <br />1 <br />2 <br />LS <br />EA <br />$ 2, Stzsti <br />7/0 <br />42, 56b"?'" <br />1/42b`� <br />f G <br />D3 <br />Pothole Existing Utilities <br />D4 <br />Shoring or Extra Excavation Class B <br />2,000 <br />SF <br />$ <br />D5 <br />Water Main Modifications, Complete <br />1 <br />LS <br />°° <br />t{, ;24 <br />Subtotal Schedule D S <br />Schedule D Washington State Sales Tax at 9.5% $ '1, ZGI <br />Q <br />Total Schedule D $ �, l �� 4 <br />he Contractor shall collect from the Contracting Agency retail sales tax on the SCHEDULE D <br />cont t price per section 1- 07.2(2) and WAC 458 -20 -170 <br />Total Schedu <br />Tot B, C, & D: <br />Schedule A b� orward <br />s g <br />Schedule B brought forwa <br />Schedule C brought forward <br />Schedule D brought forward <br />Total Bid <br />Note: D <br />$ l r� , 7' 5' - <br />$ ) Z.( 4( `71a <br />$ qc 187 Yb <br />Zt o58j 3v <br />mination of low bidder will be based solely on the 'Total BI . . <br />Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scale <br />
The URL can be used to link to this page
Your browser does not support the video tag.