Laserfiche WebLink
ATTACHMENT D <br />City of Tukwila <br />ATTACHMENT D <br />Jim Haggerton, Mayor <br />Department of Community Development Jack Pace, Director <br />Notice of Application Comment (received by email on July 28, 2014): <br />Hello, <br />Thank you for this opportunity to address my concerns regarding the proposed construction of eight <br />town homes at the west side of 51st Ave. S. between Hazel St. and S. Fountain St. in Tukwila. <br />I live across the street from the proposed town homes. Of most concern is the existing condition of the <br />road on which all the trucks carrying heavy equipment will be traveling back and forth on 51st Ave S. <br />The concrete slabs on the road are buckling and cannot support the extra weight. The vibration of the <br />rattling slabs caused chunks of my chimney to fall off. Also, Metro discontinued its articulated bus <br />service along the top of 51st Ave. S. because of the weight's damage on the road. Will Abbey Road <br />Group Land Development Services Company be a good corporate citizen willing to repair the road <br />damage done by all the construction trucks going back and forth? <br />My other concern which I'm sure is shared by my neighbors is how tall the construction will be. We <br />don't want the town homes' occupants to be able to peer into our backyards. There was no mention of <br />the height of the town homes in the Notice of Application we received. <br />I urge you to do the necessary due diligence regarding the above points before the actual construction <br />takes place. <br />Thank you, <br />Kevin Fleming <br />5109 S. Hazel St. <br />BAR — 51" Avenue S Townhomes December 11 2014 <br />37 <br />