City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
Planning 2016-04-28 Item 5 - Public Hearing: Woodspring Suites - Attachment A - Applicant's Response to Design Criteria
COT-City
>
City Clerk
>
Boards and Commissions
>
Planning Commission
>
Planning Commission Agenda Packets
>
2011-2019 Agenda Packets
>
2016-04-28 Planning Commission / Board of Architectural Review Public Hearing - Woodspring Suites
>
Planning 2016-04-28 Item 5 - Public Hearing: Woodspring Suites - Attachment A - Applicant's Response to Design Criteria
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2016 2:38:24 PM
Creation date
4/21/2016 2:38:23 PM
Metadata
Fields
Template:
Boards and Commissions
Date (mm/dd/yy)
04/28/16
Board or Commission Name
Planning Commission
Agenda or Minutes
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Woodspring Suites Tukwila <br />Response to Review Comments <br />CPH No. 0728-75-O02 <br />December D3,2U76 <br />Page l2ofl4 <br />l2) Building Materials and Colors <br />l' See section related to EIFS —finishes should be sheltered from extreme weather by roof <br />overhangs or other methods and weather exposed horizontal surfaces should be avoided. EIFS <br />should not extend below two feet above the ground plane — what treatment will be used in <br />these areas? <br />8IFS is not used except for above the first floor. Brick and/or fiber cement siding is proposed <br />for the entire first floor exterior finish. <br />2. EIFS finishes are acceptable finishes for upper stories only at street exposures on commercial <br />buildings. They should not be used at storefronts. They may be used at ground floor portions <br />of rear or side service and parking exposures and in such cases should be specified with high- <br />density material, with the ground floor st,eetfogodm cladding mo/edu|s continuing to be used <br />oso building base and accent material. <br />Response: EIFS is not used except for above the first floor. Brick aod/or fiber cement siding isproposed <br />for the entire first floor exterior finish. <br />3. Dark brown hordi-pkznkis primary color, light color ofBFS used os secondary color, orange- <br />brown as accent at entry and building 600k-en6s. How will light-color BFShold op overtime? <br />Respmnse/A fine grain finish (to avoid trapping dirt) will 6e specified for fBFS and while cleaning may <br />be required every 3-f years the integral color will hold op well and has m proven track record om <br />compared h» older EIFSassemblies. <br />13) Windows <br />1' Need details on how project is designed tomeet these criteria. <br />Response: Windows /n brick and EIfS will 6e recessed between 4`�-6&' from the main &xcode. N/inco*v <br />scale &appropriate for the use and oversized windows in guestrooms should be avoided especially at <br />ground level. Trim and EIFS joints have been utilized toemphasize windows in each fa5ade material. <br />74Q Weather Protection <br />l' Provided at hotel entrance; not required elsewhere because building orientation is not <br />required. However, this would help with the criteria related toproviding o base tothe <br />building. <br />Response: A canopy has been provided mf the main entrance and rear entrance of substantial stature hm <br />emphasize the entry. Small roofs have been provided mn secondary entrances fm aid /n rain protection. <br />15) Blank Walls <br />l. Blank walls meeting the definition are likely located on all elevations. Please look at the <br />criteria related to blank walls and o66veo' Detailed, dimensioned and scalable building <br />elevations are necessary |n order hz determine compliance with this criteria. <br />Response: Blank walls have been avoided by the use of windows and window detailing along with <br />vertical and horizontal ElFS joints. Material and color changes help break op areas into smaller blocks <br />of color with detailing hz give the feet ofmn overall design scheme. <br />Informational Notes: <br />Fire Depaltment <br />l' The proposed structure will be equipped with a full fire sprinkler system per Tukwila <br />Municipal Code l6~42' <br />Response. Acknowledged. <br />�� <br />���" <br />
The URL can be used to link to this page
Your browser does not support the video tag.