City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
Planning 2016-04-28 Item 5 - Public Hearing: Woodspring Suites - Attachment A - Applicant's Response to Design Criteria
COT-City
>
City Clerk
>
Boards and Commissions
>
Planning Commission
>
Planning Commission Agenda Packets
>
2011-2019 Agenda Packets
>
2016-04-28 Planning Commission / Board of Architectural Review Public Hearing - Woodspring Suites
>
Planning 2016-04-28 Item 5 - Public Hearing: Woodspring Suites - Attachment A - Applicant's Response to Design Criteria
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2016 2:38:24 PM
Creation date
4/21/2016 2:38:23 PM
Metadata
Fields
Template:
Boards and Commissions
Date (mm/dd/yy)
04/28/16
Board or Commission Name
Planning Commission
Agenda or Minutes
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Woodspring Suites Tukwila <br />Response to Review Comments <br />CPH No. 0128-15-002 <br />December 23, 2015 <br />Page 14 of 14 <br />6. Street infrastructure within Public Right-of-Way and Public Utilities on Private Property (as <br />determined by the City) are to be part of a turnover process and on City of Tukwila forms. Public <br />Works will prepare forms, for the Owner(s) signature. <br />Response: It is understood that any public facilities installed with this project will require <br />execution of the City's standard "turnover" forms prior to acceptance of said facilities. <br />7. Show and label 'flap gate signage marker' on future Building permit storm drainage plan sheet. <br />Response: Specification and details for the storm outfall flap gate will be provided with the <br />subsequent construction plans and permit package for the site improvements for City review <br />and permit approval. <br />8. All utilities are required to be underground, per City ordinance. <br />Response: All proposed water, sanitary sewer, and storm drainage utilizes are proposed to be <br />underground. <br />9. NOTE: Public Works permit information, plan submittal criteria, standards, and specifications; are <br />available on the City's Web-Site. Go to the City Web-Site then click on City Department Directory <br />/ Public Works Department / Development & Permits. Then under Public Works Topics click on <br />Customer Assistance Bulletins (CAB) and Development Guidelines and Design & Construction <br />Standards and other topics as applicable. <br />Response: All City of Tukwila design standards and details will be referenced in final <br />engineering. <br />Please contact me directly at (425) 285-2391 or by e-mail at matt (.5-cphconsultants.com if you <br />have questions or need any additional information to complete your review and approval of the <br />project. Your prompt response is appreciated. Thank you. <br />Sincerely, <br />Cc: Mr. Broc Henderson (West 77 Partners) <br />copy to file <br />M. <br />
The URL can be used to link to this page
Your browser does not support the video tag.