Laserfiche WebLink
N/A — Non - Project Action <br />f. How many vehicular trips per day would be generated by the completed project? If <br />known, indicate when peak volumes would occur and what percentage of the volume <br />would be trucks (such as commercial and nonpassenger vehicles). What data or <br />transportation models were used to make these estimates? <br />N/A — Non - Project Action <br />g. Will the proposal interfere with, affect or be affected by the movement of agricultural <br />and forest products on roads or streets in the area? If so, generally describe. <br />N/A — Non - Project Action <br />h. Proposed measures to reduce or control transportation impacts, if any: <br />N/A — Non - Project Action <br />15. Public Services <br />a. Would the project result in an increased need for public services (for example: fire <br />protection, police protection, public transit, health care, schools, other)? If so, <br />generally describe. <br />N/A — Non - Project Action <br />b. Proposed measures to reduce or control direct impacts on public services, if any. <br />N/A — Non - Project Action <br />16. Utilities <br />a. Circle utilities currently available at the site: N/A — Non - Project Action <br />electricity, natural gas, water, refuse service, telephone, sanitary sewer, septic <br />system <br />other: <br />b. Describe the utilities that are proposed for the project, the utility providing the <br />service, and the general construction activities on the site or in the immediate <br />.l <br />SEPA Checklist <br />