City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
Planning 2016-11-10 Item 4 - TMC Chapter 18.52 Landscaping Code Update: Attachment E - SEPA Application and Checklist
COT-City
>
City Clerk
>
Boards and Commissions
>
Planning Commission
>
Planning Commission Agenda Packets
>
2011-2019 Agenda Packets
>
2016-11-10 Planning Commission Public Hearing - TMC Chapter 18.52 Landscaping Code Update / SEPA Application
>
Planning 2016-11-10 Item 4 - TMC Chapter 18.52 Landscaping Code Update: Attachment E - SEPA Application and Checklist
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/3/2016 10:39:49 AM
Creation date
11/3/2016 10:39:48 AM
Metadata
Fields
Template:
Boards and Commissions
Date (mm/dd/yy)
11/10/16
Board or Commission Name
Planning Commission
Agenda or Minutes
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
3. Estimate the amount of fill and dredge material that would be placed in or <br />removed from surface water or wetlands and indicate the area of the site <br />that would be affected. Indicate the source of fill material. <br />N/A — Non - Project Action <br />4. Will the proposal require surface water withdrawals or diversions? Give <br />general description, purpose, and approximate quantities, if known. <br />N/A — Non - Project Action <br />5. Does the proposal lie within a 100 -year floodplain? If so, note location on <br />the site plan. <br />N/A — Non - Project Action <br />6. Does the proposal involve any discharges of waste materials to surface <br />waters? If so, describe the type of waste and anticipated volume of discharge. <br />N/A — Non - Project Action <br />b. Ground: <br />1. Will groundwater be withdrawn from a well for drinking water or other <br />purposes? If so, give a general description of the well, proposed uses and <br />approximate quantities withdrawn from the well? Will water be discharged to <br />groundwater? Give general description, purpose, and approximate quantities <br />if known. <br />N/A — Non - Project Action <br />2. Describe waste materials that will be discharged into the ground from septic <br />tanks or other sources, if any (for example: Domestic sewage; industrial, <br />containing the following chemicals...; agricultural; etc). Describe the general <br />size of the system, the number of such systems, the number of houses to be <br />served (if applicable), or the number of animals or humans the system(s) are <br />expected to serve: <br />N/A — Non - Project Action <br />c. Water Runoff (including storm water): <br />-M <br />SEPA Checklist <br />
The URL can be used to link to this page
Your browser does not support the video tag.