City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
Planning 2016-11-10 Item 4 - TMC Chapter 18.52 Landscaping Code Update: Attachment E - SEPA Application and Checklist
COT-City
>
City Clerk
>
Boards and Commissions
>
Planning Commission
>
Planning Commission Agenda Packets
>
2011-2019 Agenda Packets
>
2016-11-10 Planning Commission Public Hearing - TMC Chapter 18.52 Landscaping Code Update / SEPA Application
>
Planning 2016-11-10 Item 4 - TMC Chapter 18.52 Landscaping Code Update: Attachment E - SEPA Application and Checklist
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/3/2016 10:39:49 AM
Creation date
11/3/2016 10:39:48 AM
Metadata
Fields
Template:
Boards and Commissions
Date (mm/dd/yy)
11/10/16
Board or Commission Name
Planning Commission
Agenda or Minutes
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SEPA Checklist <br />,T, e , 0 <br />a. What kinds of energy (electric, natural gas, oil, wood stove, solar) will be used to <br />meet the completed project's energy needs? Describe whether it will be used for <br />heating, manufacturing, etc. <br />N/A — Non - Project Action <br />b. Would your project affect the potential use of solar energy by adjacent <br />properties? If so, generally describe. <br />N/A — Non - Project Action <br />c. What kinds of energy conservation features are included in the plans of this <br />proposal? List other proposed measures to reduce or control energy impacts, if <br />any: <br />N/A — Non - Project Action <br />7. Environmental Health <br />a. Are there any environmental health hazards, including exposure to toxic <br />chemicals, risk of fire and explosion, spill, or hazardous waste, that could occur as <br />a result of this proposal? If so, describe. <br />N/A — Non - Project Action <br />1. Describe any known or possible contamination at the site from present or past uses. <br />N/A — Non - Project Action <br />2. Describe existing hazardous chemicals /conditions that might affect project development anddesign. <br />This includes underground hazardous liquid and gas transmission pipelines located within the project <br />area and in the vicinity. <br />N/A — Non - Project Action <br />3. Describe any toxic or hazardous chemicals that might be stored, used, or produced during the project's <br />development or construction, or at any time during the operating life of the project. <br />N/A — Non - Project Action <br />MW <br />
The URL can be used to link to this page
Your browser does not support the video tag.