City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2017-01-24 Item 2G - Final Acceptance - Crystal Springs Emergency Surface Water Repair with Frank Coluccio Construction
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-Present)
>
2017-01-24 Transportation and Infrastructure
>
TIC 2017-01-24 Item 2G - Final Acceptance - Crystal Springs Emergency Surface Water Repair with Frank Coluccio Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:29:44 PM
Creation date
1/19/2017 3:30:22 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
01/24/17
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Tukwila <br />Allan Ekberg, Mayor <br />INFORMATIONAL MEMORANDUM <br />TO: <br />Transportation and Infrastructure Committee <br />FROM: <br />Bob Giberson, Public Works Director <br />BY: <br />Ryan Larson, Senior Program Manager <br />CC: <br />Mayor Ekberg <br />DATE: <br />Janaury 20, 2017 <br />SUBJECT: <br />Crystal Springs Emergency Surface Water Repair — Construction <br />Project No. 91641206, Contract No. 16 -114 <br />Project Completion and Acceptance <br />ISSUE <br />Accept contract as complete and authorize release of retainage.. <br />BACKGROUND <br />Maintenance staff was notified of pavement settlement within Crystal Springs Park and 5151 Ave <br />S during the week of July 18, 2016. A collapsed surface water pipe was discovered with <br />additional failure of the pavement and a sinkhole. The Mayor declared an emergency on July <br />21, 2016 and Council approved Resolution No. 1887. <br />The Notice to Proceed for Contract No. 16 -114 with Frank Coluccio Construction Company of <br />Seattle, Washington was issued on July 21, 2016 for the Crystal Springs Emergency Surface <br />Water Repair - Construction. <br />ANALYSIS <br />Through this emergency contract, Frank Coluccio Construction stabilized the site by filling the <br />sinkhole, securing the utilities, and installing a temporary bypass pipe. Construction was <br />physically completed on November 11, 2016. The budget for this emergency stabilization phase <br />of the project was $180,000.00. The total cost for this contract was $164,093.54 and no change <br />orders were issued. Retainage of $7,492.86 is being withheld. <br />Construction Contract Amount $180,000.00 <br />Cost under -runs (15,906.46) <br />Total Frank Coluccio Contract $ 164.093.54 <br />RECOMMENDATION <br />Council is being asked to formally accept and authorize the release of the retainage, subject to <br />standard claim and lien release procedures, for the Crystal Springs Emergency Surface Water <br />Repair - Construction Project with Frank Coluccio Construction Company in the final amount of <br />$164,093.54 and consider this item on the Consent Agenda at the February 6, 2017 Regular <br />Meeting, <br />Attachment: Notice of Completion Contract No. 16 -114 <br />61 <br />
The URL can be used to link to this page
Your browser does not support the video tag.