City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2017-02-14 COMPLETE AGENDA PACKET
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-Present)
>
2017-02-14 Transportation and Infrastructure
>
TIC 2017-02-14 COMPLETE AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:29:44 PM
Creation date
2/9/2017 1:29:56 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
02/14/17
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
W/o Depwbnwd of Tmwpwta*m <br /> Supplemental ree Agreement Organization and Address <br /> Jacobs Engineering Group Inc <br /> Number 05 600 108th Avenue NE Suite 700 <br /> Bellevue, WA 98004 <br /> Original Agreement Number <br /> 13-161 Phone: 425-452-8000 <br /> Project Number Execution Date Completion Date <br /> 99410408,BHM- 1380(003) 10/10/2013 1 12/30/2018 <br /> Project Title New Maximum Amount Payable <br /> Boeing Access Road Over BNRR Bridge $ 1,331,513.00 <br /> Description of Work <br /> This supplement is for providing design services during construction of the project. Detailed scope and fee for the <br /> services are attached. <br /> The Local Agency of City of Tukwila <br /> desires to supplement the agreement entered into with Jacobs Engineering Group Inc. <br /> and executed on 10/10/2013 and identified as Agreement No. 13-161 <br /> All provisions in the basic agreement remain in effect except as expressly modified by this supplement. <br /> The changes to the agreement are described as follows: <br /> I <br /> Section 1, SCOPE OF WORK, is hereby changed to read: <br /> See attached Exhibit A-1 for Supplement 5 Scope of Work <br /> I I <br /> Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days for <br /> completion of the work to read: Time_for completion is revised to December 31,2p19 <br /> III <br /> Section V, PAYMENT, shall be amended as follows: <br /> Total moment will he increased by$260 956 00 <br /> as set forth in the attached Exhibit A, and by this reference made a part of this supplement. <br /> If you concur with this supplement and agree to the changes as stated above, please sign in the appropriate spaces <br /> below and return to this office for final action. <br /> By: Donald K Nelson Operation Manager By: <br /> Consultant Signature Approving Authority Signature <br /> DOT Form 140-063 EF Date <br /> Revised 9/2005 <br /> 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.