City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2017-02-14 Item 2C - Agreement - Boeing Access Road Over BNRR Bridge Rehabilitation Construction Management with Jacobs Engineering Group
COT-City
>
City Clerk
>
City Council Committees Meetings
>
Previous Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-2020)
>
2017 Transportation and Infrastructure Packets
>
2017-02-14 Transportation and Infrastructure
>
TIC 2017-02-14 Item 2C - Agreement - Boeing Access Road Over BNRR Bridge Rehabilitation Construction Management with Jacobs Engineering Group
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:29:45 PM
Creation date
2/9/2017 1:45:45 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
02/14/17
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Exhibit E <br /> OSG Estimate for Boeing Access BNRR Bridge Rehabilitation <br /> UPDATED TABLE OF BUDGET BREAKDOWN BASED ON EYE 1S OVERHEAD RATES <br /> Overhead Fee(Profit) Hourly <br /> Vis its <br /> Task Description No.is Vi Units Per No.&Type of Units Direct Lahor Billing Estimated <br /> sit Rate(NTE) Rate(NTE) f-ost <br /> 87.84f 30.00% <br /> Construction Inspections and Materials Testing Services <br /> Rcmfroced concrete 55 8 M140 hours $40.00 $35.14 $12.00 $87.14 $38,339.84 <br /> Structural steel(erection,welding,&bolting) 110 8 880 hours $40.00 $35.14 $12.00 $87.14 $76,679.68 <br /> Structural steel fabrication shop audit inspection <br /> IA15C approved fabricator) 8 8 64 hours $40.00 $35.14 $12.00 $87.14 $5,576.70 <br /> Soil and asphalt compaction 72 8 576 hours $40.00 $35.14 $12.00 $81.14 $50,190.34 <br /> Project Manager(meeting,report review,final letter) 96 1 96 hours $62.00 $54.46 $18.60 $135.06 $12,965.84 <br /> Administrative 96 1 96 hours $37.50 $32.94 $11.2.5 $81669 $7,842.24 <br /> Concrete/grout/mortar test cylinders(Unit Cost) 55 4 220 each $22.00 $4,840.00 <br /> Moisture/density relationship(ASTM D 698,D 1557) 51 1 5 each $200600 $1,000.00 <br /> Grain size analysis(ASTM C 136/C 117) 10 1 10 each $100.00 $1,000.00 <br /> Sand equivalent(ASTM D 2419( 10 1 10 each <br /> $80600 $800.00 <br /> Fracture face count(W5DOT 103) 5 1 5 each <br /> $50.00 $250.00 <br /> Rice density(ASTM D2041,AASH FO T245) 5 1 S each $90.00 $450600 <br /> Asphalt it content ignition method(ASTM D 6307) 5 1 5 each $250.00 $1,250.00 <br /> Vehicle(Unit Cost Local Seattle Area) 245 1 245 trip/day $58.00 $14,210.00 <br /> Estimated Project Budget $215,394.64 <br /> "labor rates are 15x the standard rate for nights,weekentls,and hours over 8 per day.flour hour minimum charge far inspections. <br /> -BH11.9 MultlpF"=(1.0 x dint labor rate)+10 784 x direct labor rate)+(0.30x diract W-mte)=2 178 x d-u laborlate <br /> 48 <br />
The URL can be used to link to this page
Your browser does not support the video tag.