City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2017-02-14 Item 2D - Agreement - Major Maintenance on 3 Bridges: Grady Way / Frank Zepp / Beacon Avenue Construction Management with David Evans and Associates
COT-City
>
City Clerk
>
City Council Committees Meetings
>
Previous Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-2020)
>
2017 Transportation and Infrastructure Packets
>
2017-02-14 Transportation and Infrastructure
>
TIC 2017-02-14 Item 2D - Agreement - Major Maintenance on 3 Bridges: Grady Way / Frank Zepp / Beacon Avenue Construction Management with David Evans and Associates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:29:45 PM
Creation date
2/9/2017 1:47:13 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
02/14/17
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Exhibit D1 <br /> City of Tukwila <br /> Major Maintenance of Three Bridges, Construction Engineering Support Services <br /> FRANK ZEPP Contract No. 15-139 <br /> David Evans and Associates, Inc. <br /> Direct <br /> Classification Hrs. x Rate = Cost <br /> 1 Engineering Manager(ENGM) 0 $ 66.00 0.00 <br /> 2 Project Manager(PMGR) 20 $ 66.00 1,320.00 <br /> 3 Executive Administrator(EXAD) 6 $ 38.00 228.00 <br /> 4 Managing Prof Engineer(MGPE) 0 $ 68.00 0.00 <br /> 5 Professional Engineer(PFEN) 0 $ 44.00 0.00 <br /> 6 Senior Bridge Engineer(SBEN) 0 $ 62.00 0.00 <br /> 7 Bridge Engineer(BREN) 0 $ 47.00 0.00 <br /> 8 Senior CADD Technician(SCAD) 0 $ 44.00 0.00 <br /> 9 CADD Technician(CADD) 0 $ 30.00 0.00 <br /> 10 Construction Manager(CONM) 0 $ 69.00 0.00 <br /> 11 Senior Scientist(SSCI) 4 $ 48.00 192.00 <br /> 12 Scientist(SCIT) 0 $ 34.00 0.00 <br /> 13 Survey Manager(SVYM) 6 $ 65.00 390.00 <br /> 14 Project Land Surveyor(PLSU) 0 $ 42.00 0.00 <br /> 15 Instrument Person(INST) 0 $ 26.00 0.00 <br /> 16 Administrative Assistant(ADMA) 0 $ 22.00 0.00 <br /> 17 Project Administrator(PADM) 20 $ 34.00 680.00 <br /> 18 0 0.00 <br /> Total Hrs. 56 <br /> Salary Cost 2,810.00 <br /> Salary Escalation Cost(estimated) <br /> Escalation-%of Labor Cost 0% per year @ 0 year(s) 0.00 <br /> Total Salary Cost 2,810.00 <br /> Overhead Cost @ 181.82% of Direct Labor 5,109.14 <br /> Net Fee @ 30.0% of Direct Labor 843.00 <br /> Total Overhead&Net Fee Cost 5,952.14 <br /> Direct Expenses No. Unit Each Cost <br /> Reproduction Costs <br /> Copies 200 pages @ $0.06 /page $ 12.00 <br /> Reports 0 reports @ $15 /report $ - <br /> Plans 0 sets @ $2 /set $ - <br /> Parking 0 @ $8 $ - <br /> P20 Scanner 0 @ $650 $ - <br /> Mileage 400 miles @ $0.535 /mile $ 214.00 <br /> Subtotal 226.00 <br /> Prime Compensation for Subconsultant Cost <br /> David Evans and Associates Total 8,988.14 <br /> Subconsultants <br /> - W/DBE 111159E Hrs Total <br /> Trantech, LLC 486 59,899.80 <br /> Total 0.0% 0.0% 0.0% 486 <br /> Subconsultant Total 0% 59,899.80 <br /> Direct Expenses Sub-Total(including Subconsultants) 60,125.80 <br /> Total Costs 68,887.94 <br /> Page 1 of 1 <br /> \\blvfsl\project\t\TUKA00000014\OOOOCON\0020Pre-ContractlSupplement 3\T313-Suppl.3-Fee DRAFT-3 Bridges-2017-01-11-Review MASTER.Winted:2/1/2017,8:33 AM <br /> 79 <br />
The URL can be used to link to this page
Your browser does not support the video tag.