City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2017-02-28 Item 2B - Agreement - 2017 Bridge Repairs and Maintenance: On-Call Engineering Support with TranTech Engineering
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-Present)
>
2017-02-28 Transportation and Infrastructure
>
TIC 2017-02-28 Item 2B - Agreement - 2017 Bridge Repairs and Maintenance: On-Call Engineering Support with TranTech Engineering
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:29:45 PM
Creation date
2/23/2017 3:20:30 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
02/28/17
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Tukwila <br />Allen Ekberg, Mayor <br />TO: Transportation and Infrastructure Committee <br />FROM: Bob Giberson, Public Works Director <br />By: Steve Carstens, P.E., Sr. Program Manager <br />CC: Mayor Ekberg <br />DATE: February 24, 2017 <br />SUBJECT: 2017 Bridge Program — Bridge Repairs /Maintenance <br />Project No. 91710402 <br />On -Call Engineering Support Services <br />ISSUE <br />Approve an On -Call Engineering Support Services contract with TranTech Engineering, LLC (TranTech) for the <br />2017 Bridge Program. <br />atoll] <br />There are several issues effecting the Annual Bridge Program this year. The Federal Highway Administration <br />(FHWA) has adopted new bridge load rating requirements that take effect within two years and necessitate <br />updating our existing bridge inventory load ratings. The Bridge Replacement Advisory Committee (BRAC) has <br />grant funding applications due in mid -April 2017 and the City has two structures that may be eligible for this <br />funding. The S 119th St Pedestrian bridge also requires additional work to complete its maintenance. <br />DISCUSSION <br />Tukwila has selected TranTech to provide support services for the 2017 Bridge Program through an on -call <br />services scope of work. TranTech was selected based on their extensive familiarity with the City's bridge <br />program. This contract will allow the City to address the new FHWA requirements, BRAC grant applications, <br />and complete maintenance on the S 119th St Pedestrian Bridge. <br />FISCAL IMPACT <br />TranTech has provided an estimated cost of $90,000.00 to perform the work as outlined in the attached scope <br />of work. The remaining 2017 Bridge Program funds have been analyzed and the estimated project costs are <br />within budget. <br />TranTech Enaineerina On -Call Services <br />Bridge Load Rating Updates <br />S 119th St Pedestrian Bridge <br />BRAC Funding Assistance <br />Misc. Bridge Support <br />Totals <br />Proposed Contract 2017 Budget <br />$ 41,000.00 <br />19,000.00 <br />15,000.00 <br />15,000.00 <br />90,000.00 270 000.00 <br />RECOMMENDATION <br />Council is being asked to approve the contract with TranTech Engineering, LLC for the 2017 Bridge Program in <br />the amount of $90,000.00 and consider this item on the Consent Agenda at the March 6, 2017 Regular Meeting. <br />Attachments: Page 19, 2017 CIP <br />Trantech Contract with Scope and Cost Estimate <br />W:APW Eng \PROJECTSVA- RW & RS ProjectsWridge Inspection Programs \Bridge Inspections 2017 (91610402)A02 - Trantech tasks \Info Memo Trantech 022417 gi sb.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.