Laserfiche WebLink
* No substructure load rating is performed. <br />An estimate of cost for performing Loud Rating services on the identified structures is pn:ueo1cd <br />in Exhibit B. <br />Task 3-11fldge Replacenwnt/ Rehabilitation FWodino Assistance <br />A Federal Bridge Do����|�{��io�h����s��T�3�usi�a��sia^�� <br />City io the development o[o bridge replacement/rehabilitation application package tob <br />submitted to Bridge Replacement Advisory Committee (BRAC) for the 42 d Avenue South Truss <br />in AUco(ox/o. Preliminary funding support analysis has been pocfbroocd over the last few years. <br />TRANTECH will assist the City in assembling and, if necessary, updating the existing <br />construction estimates and analysis. <br />TRANTECH will provide a 1096 uciandc retrofit design for the Boeing /\ooeax Road over <br />Airport Way Bridge ux directed by the City. An estimated cost for this work will also will also bc <br />provided for submittal as uScisooic P[o�7aolpugoci for funding consideration. <br />TRANTECH will provide overall assistance for the initial submittal package preparation per the <br />Call for Projects rnquircmenisuoddcud1ioea./\|aoioclodcd,vvU|bccuudoocdaupportthroogh <br />the spring and summer candidate review period and through the funding meeting iu the Fall of <br />2017. <br />'nask 4—MiScellmoeous Bridge Program Support <br />TKANT[CU yho]| provide roisccUancooa cn�iuccdn� Support under the dircc|iouo[ the City <br />o[Ti kn'i|u`x Pn4cci h�uux�cr. /\odcipu\cd vvurk vviU inc|udc tasks associated with the <br />cnns{ruchon phase n[{ho8ocio�&cc�ssD|oudBddocRchubUitu1ionund the &�u|oc <br />Maintenance on 3 Bridges 2015 projects, 1`ukvvi|u Bridge Prograoo1usks as idenhficdbythe <br />City, and other projects as needed. <br />Tukwila B6duu Pro-ram Bn8ucedng Suppou— SCOPBOFWO&K <br />TRANTECH ENGINEERING <br />11m <br />