City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
2017-02-14 Transportation and Infrastructure Minutes
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Minutes (2017-Present)
>
2017-02-14 Transportation and Infrastructure Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:29:36 PM
Creation date
3/8/2017 11:36:02 AM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
02/14/17
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Transportation & Infrastructure Committee Minutes ......................................................... ............................... February 14, 2017 <br />C. Contract: Boeing Access Road over BNRR Bridge Rehab Project <br />Staff is seeking Council approval of two contracts with Jacobs Engineering Group, Inc for the <br />Boeing Access Road over BNRR Bridge Rehabilitation Project. The first is Supplement No. 5 to <br />Contract #13 -161 in the amount of $260,956.00 for design support and the second is a new <br />contract in the amount of $1,524,293.83 for construction management. Both contracts together <br />will provide construction management services for the duration of the project, which will <br />rehabilitate the structurally and seismically deficient bridge. A Washington State Department <br />of Transportation ( WSDOT) federal bridge grant covers 80% of the project. UNANIMOUS <br />APPROVAL. FORWARD TO FEBRUARY 21, 2017 REGULAR CONSENT AGENDA. <br />D. Contract: Major Maintenance on 3 Bridges Project <br />Staff is seeking Council approval of two contracts with David Evans and Associations, Inc. for <br />the Major Maintenance on 3 Bridges Project. The first is Supplement No. 3 to Contract #15 -139 <br />in the amount of $138,410.22 and the second is a new contract for construction management <br />services in the amount of $423,116.68. The project will perform seismic retrofit, deck and joint <br />repair, and painting on the Frank Zepp Bridge, Grady Way Bridge and the Beacon Avenue South <br />Bridge. A WSDOT grant covers 100% of the eligible construction costs. UNANIMOUS <br />APPROVAL. FORWARD TO FEBRUARY 21, 2017 REGULAR CONSENT AGENDA. <br />III. SCATBd <br />Staff noted that SCATBd is still working to finalize its legislative agenda for 2017 and copies will be <br />shared with the Committee. <br />IV. MISCELLANEOUS <br />The Transportation Committee Meeting adjourned at 5:50 p.m. <br />f/� <br />Committee ChairApproval <br />Minutes by LH, Reviewed by GL <br />
The URL can be used to link to this page
Your browser does not support the video tag.