Laserfiche WebLink
Discretionary Work Request for Kinq <br />FORM A <br />City of: Tukwila Request Number: TK -009 Date: 03/ <br />10-022.13(K) <br />Council Approval 5/20/13 <br />County Road Services <br />10-022.13(k) supplement no 11 <br />2013 bridge repairs <br />Problem Description: Settlement has occurred on the sidewalk approaches and the asphalaproaches to <br />the bridge causing vertical differential. <br />12/2013 <br />Nature of Request: Grind and overlay asphalt approaches to match the bridge deck elevation, repair the <br />north concrete bridge abutment (cracked /broken), remove and replace sidewalk panels, and place a grout <br />overlay on sidewalk panels to eliminate vertical differential. <br />Location: Bridge crossing the Green River at the entrance to Fort Dent Park. <br />Attachments: <br />City Priority: Medium <br />Special scheduling requirements: Repairs must be scheduled to avoid conflict with soccer events at <br />Starfire Sports Complex. <br />City Project Manager - Telephone Number: Robin Tischmak - 206 - 431 -2455 <br />Authorized By: Robin Tischmak Date: 03/12/2013 <br />FORM B <br />ARMS Project #: EBS Project #: Work Order #: Form B Sent to City Date: 05/03/2013 <br />Recommended Action: Saw cut existing sidewalk and remove with jackhammers (machine may not <br />reach area). Prepare base, set forms and pour new concrete. Cover as needed with plywood for foot <br />traffic. Remove forms, debris and reseed disturbed area. Grind or needle gun existing joint to expose <br />acceptable material. Epoxy coat area to be patched; patch with high strength material. Grind bridge <br />approaches and repave fora smoother transition. <br />Proposed Schedule: May 2013 <br />County Project Manager: Ross Pettit/Ken Thurman <br />Cost Estimate: $40,355.00 <br />Authorized By (City if > $500):,. <br />Mayor <br />',Am/ <br />Comments: Plans were previously prove ed to King County staff for review. <br />Date: <br />