City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
10-022 - King County Road Services Division - Traffic and Road Maintenance in Event of Emergency or Disaster
COT-City
>
City Clerk
>
Interlocal Agreements
>
2010-2015 Interlocal Agreements
>
10-022 - King County Road Services Division - Traffic and Road Maintenance in Event of Emergency or Disaster
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2017 2:45:53 PM
Creation date
3/14/2017 2:45:09 PM
Metadata
Fields
Template:
Interlocal Agreements
Contract No (example 17-139)
10-022
Contractor (example *sabey*)
King County Road Services Division
Description (example *tourism*)
Emergency Traffic and Road Maintenance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Discretionary Work Request for Kinq <br />FORM A <br />City of: Tukwila Request Number: TK -009 Date: 03/ <br />10-022.13(K) <br />Council Approval 5/20/13 <br />County Road Services <br />10-022.13(k) supplement no 11 <br />2013 bridge repairs <br />Problem Description: Settlement has occurred on the sidewalk approaches and the asphalaproaches to <br />the bridge causing vertical differential. <br />12/2013 <br />Nature of Request: Grind and overlay asphalt approaches to match the bridge deck elevation, repair the <br />north concrete bridge abutment (cracked /broken), remove and replace sidewalk panels, and place a grout <br />overlay on sidewalk panels to eliminate vertical differential. <br />Location: Bridge crossing the Green River at the entrance to Fort Dent Park. <br />Attachments: <br />City Priority: Medium <br />Special scheduling requirements: Repairs must be scheduled to avoid conflict with soccer events at <br />Starfire Sports Complex. <br />City Project Manager - Telephone Number: Robin Tischmak - 206 - 431 -2455 <br />Authorized By: Robin Tischmak Date: 03/12/2013 <br />FORM B <br />ARMS Project #: EBS Project #: Work Order #: Form B Sent to City Date: 05/03/2013 <br />Recommended Action: Saw cut existing sidewalk and remove with jackhammers (machine may not <br />reach area). Prepare base, set forms and pour new concrete. Cover as needed with plywood for foot <br />traffic. Remove forms, debris and reseed disturbed area. Grind or needle gun existing joint to expose <br />acceptable material. Epoxy coat area to be patched; patch with high strength material. Grind bridge <br />approaches and repave fora smoother transition. <br />Proposed Schedule: May 2013 <br />County Project Manager: Ross Pettit/Ken Thurman <br />Cost Estimate: $40,355.00 <br />Authorized By (City if > $500):,. <br />Mayor <br />',Am/ <br />Comments: Plans were previously prove ed to King County staff for review. <br />Date: <br />
The URL can be used to link to this page
Your browser does not support the video tag.