Laserfiche WebLink
Discretionary Work Request for King County Road Services <br />10-022.13(i) <br />supplement no 9 <br />2013 bridge inspection <br />FORM A <br />City of: Tukwila Request Number: TK -006 Date: 07/27/2012 <br />Problem Description: New bridge constructed at Southcenter Parkway /Klickitat Drive in <br />2011. Water migrates between the bridge deck and asphalt pavement seat to stain and <br />discolor tunnel wall. <br />Nature of Request: Install a joint seal between the bridge deck and asphalt pavement seat <br />including: 3 -inch deep by 1 -inch wide sawcut, install backer rods (Cera -Rod), and cover with joint <br />seal. Traffic control will be provided by the City of Tukwila. <br />Location: Southcenter Parkway /Klickitat Drive. New bride constructed in 2011 crossing <br />over southbound lanes of Southcenter Parkway. <br />Attachments: Scope of Work <br />City Priority: High <br />Special scheduling requirements; Spring /Summer of 2013 <br />City Project Manager - Telephone Number: Robin Tischmak 206 - 431 -2455; Peter Lau <br />206 - 431 -245 <br />Authorized By: Robin Tischmak Date: 07/27/2012 <br />FORM B <br />ARMS Project #: 1118639 EBS Project #: 1118639 Work Order #: Form B <br />Sent to City Date: 10/17/2012 <br />Recommended Action: Saw cut and install expansion joints per request.Cost estimate details: <br />labor- $16,300; equipment- $490; and materials- $2,015. City will provide the necessary traffic <br />- control. <br />Proposed Schedule: 12/31/12 - 1/4/13 <br />County Project Manager: Ross Pettit <br />Cost Estimate: $18,805.00 <br />iftir 14 1., <br />Authorized By (City if > $500): ` 41 <br />Ma " aggert. s <br />Date: . �- J <br />Comments: This bridge has not yet been included in the City's bridge database. <br />