City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
10-022 - King County Road Services Division - Traffic and Road Maintenance in Event of Emergency or Disaster
COT-City
>
City Clerk
>
Interlocal Agreements
>
2010-2015 Interlocal Agreements
>
10-022 - King County Road Services Division - Traffic and Road Maintenance in Event of Emergency or Disaster
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2017 2:45:53 PM
Creation date
3/14/2017 2:45:09 PM
Metadata
Fields
Template:
Interlocal Agreements
Contract No (example 17-139)
10-022
Contractor (example *sabey*)
King County Road Services Division
Description (example *tourism*)
Emergency Traffic and Road Maintenance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
10-022(e) <br />Council Approval 2/6/12 <br />Discretionary Work Request for King County Road Services <br />FORMA <br />City of: tukwila Request Number: TK -003 Date: 10/27/2011 <br />Problem Description: Tukwila bridge number TUK 12. Undermining of the west approach to the <br />Boeing Access Road Bridge over railroads. A void has developed that needs to be filled. The approach <br />is non structural and not intended to "bridge" a void. Potential safety problem. <br />Nature of Request: King County has provided bridge inspection services. Tukwila and its consultants <br />have designed a proposed repair. This request is for King County to provide the necessary construction <br />services, in accordance with the prepared plans, to fill the void that has developed. (Plans have been <br />provided to KC bridge group.) Tukwila will provide traffic control. <br />Location: Boeing Access Road west approach to the bridge over Burlington Northern and Union <br />Pacific Railroads. TUK 12 a o I J J:" <br />Attachments: Budget 5-V(L <br />City Priority: High <br />�1111040Z.3�°. tto <br />Special scheduling requirements: Traffic volumes are very high. Weekend work may be necessary in <br />order to close portions of the roadway to keep traffic off the roadway as the fill material sets up. <br />City Project Manager Telephone Number: Robin Tischmak 206 431 -2455 <br />Authorized By: Robin Tischmak Date: 10/27/2011 <br />FORM B <br />ARMS Project M40961 EBS Project Work Order Form B Sent to City Date: <br />11/10/2011 <br />Recommended Action: Fill void under west approach slab per design plans provided by the City. City <br />will provide necessary traffic control and necessary notification. <br />Proposed Schedule: November /December 2011 <br />County Project Manager: Richard Hovde/Ross Pettit <br />Cost Estimate: $67,000.00 <br />Authorized By (City $500): Date: <br />Approved by: <br />Comments: Approved by Bob Gibberson per 11 /10 /11 email(rs). <br />MAY6 r c/� <br />
The URL can be used to link to this page
Your browser does not support the video tag.