City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
10-022 - King County Road Services Division - Traffic and Road Maintenance in Event of Emergency or Disaster
COT-City
>
City Clerk
>
Interlocal Agreements
>
2010-2015 Interlocal Agreements
>
10-022 - King County Road Services Division - Traffic and Road Maintenance in Event of Emergency or Disaster
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2017 2:45:53 PM
Creation date
3/14/2017 2:45:09 PM
Metadata
Fields
Template:
Interlocal Agreements
Contract No (example 17-139)
10-022
Contractor (example *sabey*)
King County Road Services Division
Description (example *tourism*)
Emergency Traffic and Road Maintenance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
4 I aritret ct No_ 10- 022 -1431 (u <br />. - rJ <br />Suppl®ment No_ 21' <br />( <br />FORM A <br />City of: Tukwila Request Number: TK -017 Date: 09/13/16 <br />Problem Description: Perform inspection services for 6 Tukwila bridges in 2016. <br />Nature of Request: UBIT inspections for 1 bridge: TUK -15. Routine inspections for 5 bridges: TUK -14, TUK - <br />18, TUK -20, TUK -21, and TUK -22. Tukwila will provide traffic control as necessary. <br />Location: Six (6) bridges are located over the Duwamish /Green River in Tukwila, and one (1) is located over BN <br />railroad tracks. Detailed location information is located in the Bridge Inventory accessed through the Bridge Works <br />software. <br />Attachments: N/A <br />City Priority: Medium <br />Special scheduling require'ments: Coordinate traffic control requests a minimum of one week in advance. UBIT as <br />required. - <br />City Project Manager - Telephone Number: Steve Carstens, 206 - 431 -2446 <br />Authorized By: Robin Tischmak Date: 9/12/16 <br />FORM B <br />ARMS Project #: EBS Project #: Work Order #: Form B Sent to City Date: 09/13/2016 <br />Recommended Action: UBIT inspections for 1 bridge: TUK -15 and routine inspections for 6 bridges: TUK -05, <br />TUK -14, TUK -15, TUK -18, TUK -20, and TUK -22. Provide inspection reports to WSDOT and the city after <br />completion of the inspections. <br />Cost estimate details: labor - $3,240; equipment- $110; (UBIT- $3,985); and contract- $325. <br />Proposed Schedule: 9/2016 - 12/2016 <br />County Project Manager: Ross Pettit/ Margaret Holwegner <br />Cost Estimate: $7,660.00 <br />Authorized By (City > $500): <br />Date: 9/12/16 <br />Comments: By providing city traffic flaggers for the UBIT inspections, the original cost estimate is reduced by <br />$2,500 (rs). Tukwila will provide traffic control. <br />l � 02 04/6 //VA -e-5 <br />W: \PW Eng \ PROJECTS \A- RW & RS Projects \Bridge Inspection Programs \Bridge Inspections 2016 (91610402 \2016 Bridge Inspections \Discretionary Work Request for KCTK- 17.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.