City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2017-03-28 COMPLETE AGENDA PACKET
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-Present)
>
2017-03-28 Transportation and Infrastructure
>
TIC 2017-03-28 COMPLETE AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:29:46 PM
Creation date
3/23/2017 12:34:34 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
03/28/17
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
3/21/2017 <br />WQWebSubmittal - Search <br />26b S5.C.4.b.i Number of site plans reviewed during the reporting period. <br />88 <br />27 S5.C.4.b.ii Inspected, prior to clearing and construction, permitted <br />development sites that have a high potential for sediment transport <br />as determined through plan review based on definitions and <br />requirements in Appendix 7 Determining Construction Site Sediment <br />Damage Potential, or alternatively, inspected all construction sites <br />meeting the minimum thresholds adopted pursuant to S5.C.4.a.i. <br />(S5.C.4.b.ii) <br />Yes No <br />27b S5.C.4.b.ii Number of construction sites inspected per S5.C.4.b.ii. <br />26 <br />28 S5.C.4.b.iii Inspected permitted development sites during construction to verify <br />proper installation and maintenance of required erosion and <br />sediment controls. (S5.C.4.b.iii) <br />Yes No <br />28b S5.C.4.b.iii Number of construction sites inspected per S5.C.4.b.iii. <br />26 <br />29 S5.C.4.b.ii, iii and Number of enforcement actions taken during the reporting period <br />(based on construction phase inspections at new development and <br />redevelopment projects). (S5.C.4.b.ii, iii and v) <br />0 <br />30 S5.C.4.b.iv Inspected all permitted development sites that meet the thresholds <br />in S5.C.4.a.i upon completion of construction and prior to final <br />approval or occupancy to ensure proper installation of permanent <br />stormwater facilities. (S5.C.4.b.iv) <br />Yes 'No <br />31 S5.C.4.b.ii -iv Achieved at least 80% of scheduled construction- related <br />inspections. (S5.C.4.b.ii -iv) <br />Yes No <br />Number Permit Section Question <br />II Ila <br />https: // secureaccess. wa. gov/ ecy/ wgwebportal/ wgwebsubmittal/ QuesbonnaireCategory .aspx ?Categoryld =30 2/4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.