City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2017-03-28 COMPLETE AGENDA PACKET
COT-City
>
City Clerk
>
City Council Committees Meetings
>
Previous Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-2020)
>
2017 Transportation and Infrastructure Packets
>
2017-03-28 Transportation and Infrastructure
>
TIC 2017-03-28 COMPLETE AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:29:46 PM
Creation date
3/23/2017 12:34:34 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
03/28/17
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Tukwila <br />Stormwater Management Program Plan <br />TABLE OF CONTENTS <br />INTRODUCTION......................................................................................... ..............................1 <br />NPDES PHASE II PROGRAM COMPONENTS ..................................... ..............................2 <br />1. Public Education and Outreach .............................................................. ..............................2 <br />2. Public Involvement and Participation .................................................... ..............................4 <br />3. Illicit Discharge Detection and Elimination .......................................... ..............................4 <br />4. Controlling Runoff from New Development, Redevelopment, and Construction Sites ...... 6 <br />5. l%,arr� (J pa] ()perr°atnanrr s aml l la'Jl tmarr�ce ................................................ ..............................7 <br />6. Compliance with Total Maximum Daily Load Requirements ............... ..............................9 <br />7. Monitoring and Assessment ................................................................... ..............................9 <br />CONCLUSION............................................................................................ .............................10 <br />041 <br />
The URL can be used to link to this page
Your browser does not support the video tag.