City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2017-03-28 Item 2B - Contract Supplement #7 - South 144th Street Phase II (42nd Avenue South - Tukwila International Boulevard) with KPG Inc
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-Present)
>
2017-03-28 Transportation and Infrastructure
>
TIC 2017-03-28 Item 2B - Contract Supplement #7 - South 144th Street Phase II (42nd Avenue South - Tukwila International Boulevard) with KPG Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:29:46 PM
Creation date
3/23/2017 1:14:25 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
03/28/17
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Construction Management (CM) Service Interviews: AKANA, AECOM and KPG were interviewed by the City, to compete for the <br />selection of CM Consultant for the South 144th Street Phase 2 Construction Project. Three evaluation criteria were used in the <br />interview process: <br />1. Qualifications of the proposed CM team, and available support from the Consultant firm - 50 %. <br />2. Demonstration of the Consultant's understanding for the construction project - 25 %. <br />3. Demonstration of the Consultant's understanding for the CM scope of work, including the flexibility of the inspection provision <br />and inspection partnership - 25 %. <br />Below are the ranking scores rated by the 3 Interview Panelists, based on the performances of these 3 firms: <br />Cyndy Knighton Scott Moore Peter Lau <br />CM Consultant Candidates <br />Ranking <br />Summation <br />Finalized Ranking <br />AKANA <br />2 <br />2 <br />1 <br />5 <br />2 <br />AECOM <br />3 <br />3 <br />3 <br />9 <br />3 <br />KPG <br />1 <br />2 <br />4 <br />1 <br />As a result, KPG was selected as the CM Consultant for the South 144th Street Phase 2 Construction Project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.