City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2017-03-28 Item 2B - Contract Supplement #7 - South 144th Street Phase II (42nd Avenue South - Tukwila International Boulevard) with KPG Inc
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-Present)
>
2017-03-28 Transportation and Infrastructure
>
TIC 2017-03-28 Item 2B - Contract Supplement #7 - South 144th Street Phase II (42nd Avenue South - Tukwila International Boulevard) with KPG Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:29:46 PM
Creation date
3/23/2017 1:14:25 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
03/28/17
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT A -7 <br />II. SCOPE OF WORK <br />TASK 1— MANAGEMENT /COORDINATION /ADMINISTRATION <br />Provide overall project management, coordination with the City, monthly progress reports, and invoicing. <br />This effort will include the following elements. <br />• Organize and layout work for project staff. Prepare project instructions on contract <br />administration procedures to be used during construction. <br />• Review monthly expenditures and CM team scope activities. Prepare and submit invoices <br />describing CM services provided each month. Prepare and submit reporting required by funding <br />source(s), if any. <br />Deliverables <br />• Monthly invoices and progress reports <br />TASK 2 — PRECONSTRUCTION SERVICES <br />2.1 Prepare the Record of Materials (ROM): The Consultant shall prepare the ROM to aid <br />consultant, City and Contractor staff to track material submittals and testing throughout the <br />project. <br />2.2 Right of Entry Support: Develop a matrix of property owners that will document <br />commitments to each property owners, property restoration, and other related impacts. Assist <br />the City with any right of entry agreements that have not been previously secured. <br />2.3 File Setup: Attend meeting with City Project Manager to review standard Consultant and City <br />file systems and develop file structure for management of the project. <br />2.4 Field Review: Perform plans in hand field review with inspector and project engineer to <br />review the overall scope, identify challenging areas, and identify traffic concerns to be <br />addressed in the Contractors traffic control plans. <br />2.5 Preconstruction Conference: The Consultant will prepare an agenda for, distribute notices <br />of, and conduct a preconstruction conference in the City's offices. The Consultant's project <br />manager, project engineer, document control specialist, and inspector will attend the <br />preconstruction conference. The Consultant will prepare a written record of the meeting and <br />distribute copies of the minutes to all attendees and affected agencies, staff, etc. <br />At the Pre - construction conference, the Consultant shall facilitate discussions with the <br />Contractor concerning the plans, specifications, schedules, and issues with utilities, unusual <br />conditions, local requirements, EEO, and any other items that will result in better project <br />understanding among the parties involved. <br />Deliverables <br />• Record of Materials (ROM) <br />• Preconstruction conference agenda with meeting minutes <br />S 1440 Street -Phase li KPG 37 <br />Supp 7— Construction Services 2 of 7 February 24, 2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.